Bui solar farm
From Global Energy Monitor
This article is part of the Global Solar Power Tracker, a Global Energy Monitor project. |
Other names: Bolgatanga Solar Pv (Phase 4), Zebilla Solar (Phase 5)
Bui solar farm is an operating solar photovoltaic (PV) farm in Yendi, Ghana.
Project Details
Table 1: Phase-level project details for Bui solar farm
Phase name | Status | Commissioning year | Nameplate capacity | Technology | Owner |
---|---|---|---|---|---|
1 | Operating[1] | 2023[1] | 50 MWp/dc[2] | PV[2] | Bui Power Authority (BPA) [100%][2] |
2 | Announced[2] | – | 30 MW[2] | PV[2] | Bui Power Authority (BPA) [100%][2] |
3 | Announced[2] | – | 30 MW[2] | PV[2] | Bui Power Authority (BPA) [100%][2] |
4 | Announced[2] | – | 30 MW[2] | PV[2] | Bui Power Authority (BPA) [100%][2] |
5 | Announced[2] | – | 30 MW[2] | PV[2] | Bui Power Authority (BPA) [100%][2] |
6 | Announced[3] | – | 30 MW[2] | PV[2] | Bui Power Authority (BPA) [100%][2] |
7 | Announced[4] | – | 30 MW[2] | PV[4] | Bui Power Authority (BPA) [100%][2] |
8 | Announced[4] | – | 30 MW[2] | PV[4] | Bui Power Authority (BPA) [100%][2] |
Read more about Solar capacity ratings.
Location
Table 2: Phase-level location details for Bui solar farm
Phase Name | Location | Coordinates (WGS 84) |
---|---|---|
1 | Yendi, Ghana[5] | 8.2784, -2.2368 (exact)[5] |
2 | Buipe, Ghana[2] | 8.7896, -1.4680 (approximate)[2] |
3 | Sawla, Ghana[2] | 9.2726, -2.4161 (approximate)[2] |
4 | Bolgatanga, Ghana[2] | 10.7950, -0.8609 (approximate)[2] |
5 | Zebilla, Ghana[2] | 10.9401, -0.4803 (approximate)[2] |
6 | Tumu, Ghana[2] | 8.1198, -1.0223 (approximate)[2] |
7 | Bawku, Ghana[2] | 8.1198, -1.0223 (approximate)[2] |
8 | Pru East District, Bono East Region, Ghana[2] | 8.1198, -1.0223 (approximate)[2] |
The map below shows the locations of the solar farm phases:
Articles and Resources
Additional data
To access additional data, including an interactive map of global solar farms, a downloadable dataset, and summary data, please visit the Global Solar Power Tracker on the Global Energy Monitor website.
References
- ↑ 1.0 1.1 https://www.msn.com/en-xl/africa/ghana/bui-power-authority-s-50mwp-solar-pv-farm-to-be-completed-end-of-2023/ar-AA1cGGdQ?apiversion=v2&noservercache=1&domshim=1&renderwebcomponents=1&wcseo=1&batchservertelemetry=1&noservertelemetry=1.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 2.00 2.01 2.02 2.03 2.04 2.05 2.06 2.07 2.08 2.09 2.10 2.11 2.12 2.13 2.14 2.15 2.16 2.17 2.18 2.19 2.20 2.21 2.22 2.23 2.24 2.25 2.26 2.27 2.28 2.29 2.30 2.31 2.32 2.33 2.34 2.35 2.36 2.37 2.38 2.39 https://web.archive.org/web/20221013162347/https://3news.com/yendi-to-get-90m-solar-power-plant/. Archived from the original on 13 October 2022.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://web.archive.org/web/20240207141247/https://buipower.com/250mwp-solar-project/. Archived from the original on 2024-02-07.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 4.0 4.1 4.2 4.3 https://web.archive.org/web/20240207102636/https://aowenergy.com/Articles/energy-ghana---bui-power-to-install-8-solar-p. Archived from the original on 2024-02-07.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 5.0 5.1 https://www.africa-energy.com/ https://www.nature.com/articles/s41597-022-01922-1, https://www.africa-energy.com/.
{{cite web}}
: Check|url=
value (help); Missing or empty|title=
(help)