Bukhara Teploenergo 3 power station
Part of the Global Oil and Gas Plant Tracker, a Global Energy Monitor project. |
Related categories: |
Bukhara Teploenergo 3 power station (котельная №-3 предприятия «Теплоэнерго» г.Бухары) is a power station in the pre-permit stage in Bukhara, Uzbekistan. It is also known as 3-boiler plant of the Teploenergo enterprise in Bukhara.
Location
Table 1: Project-level location details
Plant name | Location | Coordinates (WGS 84) |
---|---|---|
Bukhara Teploenergo 3 power station | Bukhara, Bukhara, Bukhara, Uzbekistan | 39.743978, 64.411911 (exact)[1] |
The map below shows the exact location of the power station.
Unit-level coordinates (WGS 84):
- Unit 1, Unit 2: 39.743978, 64.411911
Project Details
Table 2: Unit-level details
Unit name | Status | Fuel(s) | Capacity (MW) | Technology | CHP | Start year | Retired year |
---|---|---|---|---|---|---|---|
Unit 1 | pre-permit[2][3] | fossil gas - natural gas[4] | 54[4] | gas turbine[4] | – | 2024[3] | – |
Unit 2 | pre-permit[2][3] | fossil gas - natural gas[4] | 54[4] | gas turbine[4] | – | 2024[3] | – |
CHP is an abbreviation for Combined Heat and Power. It is a technology that produces electricity and thermal energy at high efficiencies. Coal units track this information in the Captive Use section when known.
Table 3: Unit-level ownership and operator details
Unit name | Owner |
---|---|
Unit 1 | Teploenergo [100.0%] |
Unit 2 | Teploenergo [100.0%] |
Background
In May 2023, an agreement was signed between JSC Thermal Power Stations and Siemens Energy for installation of two gas turbines, 54 MW each, at the power station.[5] The turbines were expected to be delivered and installed in 2023 and commissioned in December 2023.[6] As of March 2024, there have not been any updates about the project.
Articles and Resources
References
- ↑ https://www.google.com/maps/place/Kotel'naya+Rk-3/@39.743775864.409336517z/data=!4m14!1m7!3m6!1s0x3f500710b5243333:0x29f47d8229fb79f7!2sKotel'naya+Rk-3!8m2!3d39.7437717!4d64.4119114!16s%2Fg%2F11pr3_thcy!3m5!1s0x3f500710b5243333:0x29f47d8229fb79f7!8m2!3d39.7437717!4d64.4119114!16s%2Fg%2F11pr3_thcy?entry=ttu.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 2.0 2.1 https://neftegaz.ru/news/energy/778894-siemens-i-uzbekistan-zaklyuchili-soglasheniya-v-sfere-energetiki-na-72-mln-evro/.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 3.0 3.1 3.2 3.3 https://web.archive.org/web/20240404092857/https://kun.uz/en/news/2023/05/03/siemens-to-build-two-tpps-in-uzbekistan. Archived from the original on 04 April 2024.
{{cite web}}
: Check date values in:|archive-date=
(help); Missing or empty|title=
(help) - ↑ 4.0 4.1 4.2 4.3 4.4 4.5 https://web.archive.org/web/20240120032332/http://www.uzdaily.com/en/post/80743. Archived from the original on 20 January 2024.
{{cite web}}
: Missing or empty|title=
(help) - ↑ "Siemens и Узбекистан заключили соглашения в сфере энергетики на 72 млн евро". neftegaz.ru. May 5, 2023. Retrieved March 29, 2024.
{{cite web}}
: CS1 maint: url-status (link) - ↑ "Siemens to build two TPPs in Uzbekistan". kun.uz. May 3, 2023. Retrieved March 29, 2023.
{{cite web}}
: CS1 maint: url-status (link)
Additional data
To access additional data, including an interactive map of gas-fired power stations, a downloadable dataset, and summary data, please visit the Global Oil and Gas Plant Tracker on the Global Energy Monitor website.