Bullington Cross wind farm

From Global Energy Monitor
This article is part of the
Global Wind Power Tracker, a Global Energy Monitor project.
Report an error

Bullington Cross wind farm is a cancelled wind farm in Winchester, Hampshire, South East England, England, United Kingdom.

Project Details

Table 1: Phase-level project details for Bullington Cross wind farm

Status Nameplate capacity Type Operator
Cancelled[1] 14 MW[1] Onshore EDF Energy[1]

Location

Table 2: Phase-level location details for Bullington Cross wind farm

Location Coordinates (WGS 84)
Winchester, Hampshire, South East England, England, United Kingdom[1] 51.1887, -1.3118 (exact)[1]

The map below shows the exact location of the wind farm:

Loading map...

Articles and Resources

Additional data

To access additional data, including an interactive map of global wind farms, a downloadable dataset, and summary data, please visit the Global Wind Power Tracker on the Global Energy Monitor website.

References

  1. 1.0 1.1 1.2 1.3 1.4 "Renewable Energy Planning Database". United Kingdom Government. March, 2021. Archived from the original on June 21, 2021. Retrieved May 24, 2021. {{cite web}}: Check date values in: |date= (help)