Bunakha hydroelectric plant

From Global Energy Monitor
Part of the
Global Hydropower Tracker,
a Global Energy Monitor project.
Report an error

Bunakha hydroelectric plant is a cancelled hydroelectric power plant in Bunakha Village, Bunakha Chiwog, Chapcha Gewog, Chukha District, Bhutan.

Project Details

Table 1: Project details for Bunakha hydroelectric plant

Status Nameplate capacity Turbines Technology type Owner
Cancelled[1] 180 MW[2] 3 x 60 MW[2] Conventional storage[3] Druk Green Power CORP LTD (DGPC); Tehri Hydro Development CORP LTD (THDCL)[4]

Location

Table 2: Location details for Bunakha hydroelectric plant

Location River Coordinates (WGS 84)
Bunakha Village, Bunakha Chiwog, Chapcha Gewog, Chukha District, Bhutan[3] Wangchu River[5] 27.1404, 89.5374 (approximate)[3]

The map below shows the approximate location of the hydroelectric power plant:

Loading map...

Articles and Resources

Additional data

To access additional data, including an interactive map of global nuclear power plants, a downloadable dataset, and summary data, please visit the Global Hydropower Tracker on the Global Energy Monitor website.

References

  1. 4 years no published updates
  2. 2.0 2.1 (PDF) https://thdc.co.in/sites/default/files/Bunakha%20HEP%20%28180%20MW%29%20Progress%20Report%20April%202019.pdf. {{cite web}}: Missing or empty |title= (help)
  3. 3.0 3.1 3.2 https://www.thdc.co.in/en/content/bunakha-he-project. {{cite web}}: Missing or empty |title= (help)
  4. https://web.archive.org/web/20221226212459/https://www.orfonline.org/research/bhutans-20-year-economic-development-and-transition-to-democracy-an-assessment-of-indias-role-64630/. Archived from the original on 26 December 2022. {{cite web}}: Missing or empty |title= (help)
  5. https://web.archive.org/web/20220527000817/https://www.power-technology.com/marketdata/bunakha-bhutan/. Archived from the original on 27 May 2022. {{cite web}}: Missing or empty |title= (help)