Bundorf Solar Park
From Global Energy Monitor
This article is part of the Global Solar Power Tracker, a Global Energy Monitor project. |
Other names: Bundorf Feld 1 (Phase 1-1)
Bundorf Solar Park is an operating solar photovoltaic (PV) farm in Bavaria, Germany.
Project Details
Table 1: Phase-level project details for Bundorf Solar Park
Phase name | Status | Commissioning year | Nameplate capacity | Technology | Owner | Operator |
---|---|---|---|---|---|---|
1 | Operating[1] | 2023[1] | 20 MWp/dc[1] | PV[1] | Maxsolar GmbH [100%][2] | Bürgersolarpark Bundorf[1] |
2-6 | Operating[1] | 2023[1] | 105 MWp/dc[2] | PV[2] | Maxsolar GmbH [100%][2] | Bürgersolarpark Bundorf[1] |
Read more about Solar capacity ratings.
Location
Table 2: Phase-level location details for Bundorf Solar Park
Phase Name | Location | Coordinates (WGS 84) |
---|---|---|
1 | Bavaria, Germany[1] | 50.2282, 10.5165 (exact)[1] |
2-6 | Bavaria, Germany[1] | 50.2282, 10.5165 (exact)[1] |
The map below shows the exact locations of the solar farm phases:
Articles and Resources
Additional data
To access additional data, including an interactive map of global solar farms, a downloadable dataset, and summary data, please visit the Global Solar Power Tracker on the Global Energy Monitor website.
References
- ↑ 1.00 1.01 1.02 1.03 1.04 1.05 1.06 1.07 1.08 1.09 1.10 1.11 "Marktstammdatenregister (Market master data register)". Germany Federal Network Agency. 2023-02. Archived from the original on 2024-01-25. Retrieved 2023-02.
{{cite web}}
: Check date values in:|access-date=
and|date=
(help) - ↑ 2.0 2.1 2.2 2.3 https://web.archive.org/web/20240201204129/https://renewablesnow.com/news/maxsolar-begins-construction-of-125-mwp-solar-park-in-bavaria-802574/. Archived from the original on 2024-02-01.
{{cite web}}
: Missing or empty|title=
(help)