Buranga geothermal power plant

From Global Energy Monitor
This article is part of the
Global Geothermal Power Tracker, a Global Energy Monitor project.
Report an error

Buranga geothermal power plant is a cancelled geothermal power plant in Mongiro, Uganda.

Project Details

Table 1: Unit-level project details for Buranga geothermal power plant

Status Commissioning year Nameplate capacity Technology Owner Operator
Cancelled[1] 2025[2] 100 MW[2] Unknown type Gids Consult Ltd [100%][2] Gids Consult[2]

Location

Table 2: Unit-level location details for Buranga geothermal power plant

Location Coordinates (WGS 84)
Mongiro, Uganda[3] 0.8332, 30.1664 (approximate)[3]

The map below shows the approximate location of the geothermal power plant:

Loading map...

Articles and Resources

Additional data

To access additional data, including an interactive map of global geothermal power plants, a downloadable dataset, and summary data, please visit the Global Geothermal Power Tracker on the Global Energy Monitor website.

References

  1. https://web.archive.org/web/20221129111356/https://www.power-technology.com/marketdata/buranga-geothermal-power-station-uganda/. Archived from the original on 2022-11-29. {{cite web}}: Missing or empty |title= (help)
  2. 2.0 2.1 2.2 2.3 https://web.archive.org/web/20220511214356/https://www.thinkgeoenergy.com/uganda-targets-geothermal-development-of-up-to-100-mw-by-2025/. Archived from the original on 2022-05-11. {{cite web}}: Missing or empty |title= (help)
  3. 3.0 3.1 (PDF) https://web.archive.org/web/20230122201213/https://www.irena.org/-/media/Files/IRENA/Agency/Publication/2020/Nov/IRENA_Geothermal_Eastern_Africa_2020.pdf. Archived from the original (PDF) on 2023-01-22. {{cite web}}: Missing or empty |title= (help)