Buranga geothermal power plant
From Global Energy Monitor
This article is part of the Global Geothermal Power Tracker, a Global Energy Monitor project. |
Buranga geothermal power plant is a cancelled geothermal power plant in Mongiro, Uganda.
Project Details
Table 1: Unit-level project details for Buranga geothermal power plant
Status | Commissioning year | Nameplate capacity | Technology | Owner | Operator |
---|---|---|---|---|---|
Cancelled[1] | 2025[2] | 100 MW[2] | Unknown type | Gids Consult Ltd [100%][2] | Gids Consult[2] |
Location
Table 2: Unit-level location details for Buranga geothermal power plant
Location | Coordinates (WGS 84) |
---|---|
Mongiro, Uganda[3] | 0.8332, 30.1664 (approximate)[3] |
The map below shows the approximate location of the geothermal power plant:
Articles and Resources
Additional data
To access additional data, including an interactive map of global geothermal power plants, a downloadable dataset, and summary data, please visit the Global Geothermal Power Tracker on the Global Energy Monitor website.
References
- ↑ https://web.archive.org/web/20221129111356/https://www.power-technology.com/marketdata/buranga-geothermal-power-station-uganda/. Archived from the original on 2022-11-29.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 2.0 2.1 2.2 2.3 https://web.archive.org/web/20220511214356/https://www.thinkgeoenergy.com/uganda-targets-geothermal-development-of-up-to-100-mw-by-2025/. Archived from the original on 2022-05-11.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 3.0 3.1 (PDF) https://web.archive.org/web/20230122201213/https://www.irena.org/-/media/Files/IRENA/Agency/Publication/2020/Nov/IRENA_Geothermal_Eastern_Africa_2020.pdf. Archived from the original (PDF) on 2023-01-22.
{{cite web}}
: Missing or empty|title=
(help)