Burgos 1 Wind Power Project
From Global Energy Monitor
This article is part of the Global Wind Power Tracker, a Global Energy Monitor project. |
Other names: Burgos 1 Wind Power Project, Burgos Ilocos
Burgos 1 Wind Power Project is an announced wind farm in Burgos, Ilocos Norte Province, Philippines.
Project Details
Table 1: Phase-level project details for Burgos 1 Wind Power Project
Status | Commissioning year | Nameplate capacity | Type |
---|---|---|---|
Announced[1] | 2035 (planned)[2] | 60 MW[3] | Onshore[3] |
Location
Table 2: Phase-level location details for Burgos 1 Wind Power Project
Location | Coordinates (WGS 84) |
---|---|
Burgos, Ilocos Norte Province, Philippines[3] | 18.5339, 120.6349 (approximate)[3] |
The map below shows the approximate location of the wind farm:
Articles and Resources
Additional data
To access additional data, including an interactive map of global wind farms, a downloadable dataset, and summary data, please visit the Global Wind Power Tracker on the Global Energy Monitor website.
References
- ↑ (PDF) https://doe.gov.ph/sites/default/files/pdf/electric_power/05_Luzon_Indicative_30_apr_2024.pdf https://www.doe.gov.ph/sites/default/files/pdf/electric_power/annex-a_coe-to-ngcp-clearance-to-undertake-sis-december-2022.pdf, https://doe.gov.ph/sites/default/files/pdf/electric_power/05_Luzon_Indicative_30_apr_2024.pdf.
{{cite web}}
: Check|url=
value (help); Missing or empty|title=
(help) - ↑ (PDF) https://www.doe.gov.ph/sites/default/files/pdf/electric_power/annex-a_coe-to-ngcp-clearance-to-undertake-sis-december-2022.pdf, https://www.doe.gov.ph/sites/default/files/pdf/electric_power/luzon_indicative_2022-mar-31-updated-05172022.pdf?withshield=1 https://doe.gov.ph/sites/default/files/pdf/electric_power/05_Luzon_Indicative_30_apr_2024.pdf, https://www.doe.gov.ph/sites/default/files/pdf/electric_power/annex-a_coe-to-ngcp-clearance-to-undertake-sis-december-2022.pdf, https://www.doe.gov.ph/sites/default/files/pdf/electric_power/luzon_indicative_2022-mar-31-updated-05172022.pdf?withshield=1.
{{cite web}}
: Check|url=
value (help); Missing or empty|title=
(help) - ↑ 3.0 3.1 3.2 3.3 (PDF) https://web.archive.org/web/20230126184348/https://www.doe.gov.ph/sites/default/files/pdf/electric_power/annex-a_coe-to-ngcp-clearance-to-undertake-sis-december-2022.pdf. Archived from the original (PDF) on 2023-01-26.
{{cite web}}
: Missing or empty|title=
(help)