Busmayor wind farm
From Global Energy Monitor
This article is part of the Global Wind Power Tracker, a Global Energy Monitor project. |
Busmayor wind farm (Parque eólico Busmayor) is a wind farm in pre-construction in Cacabelos, León, Castilla y León, Spain.
Project Details
Table 1: Phase-level project details for Busmayor wind farm
Status | Nameplate capacity | Type | Owner |
---|---|---|---|
Pre-construction[1][2] | 60 MW[1] | Onshore[1] | Enel Green Power España SL [100%][1] |
Location
Table 2: Phase-level location details for Busmayor wind farm
Location | Coordinates (WGS 84) |
---|---|
Cacabelos, León, Castilla y León, Spain[1] | 42.623424, -6.735704 (approximate)[1] |
The map below shows the approximate location of the wind farm:
Articles and Resources
Additional data
To access additional data, including an interactive map of global wind farms, a downloadable dataset, and summary data, please visit the Global Wind Power Tracker on the Global Energy Monitor website.
References
- ↑ 1.0 1.1 1.2 1.3 1.4 1.5 (PDF) https://web.archive.org/web/20240327050629/https://boe.es/boe/dias/2023/08/02/pdfs/BOE-A-2023-17790.pdf. Archived from the original (PDF) on 27 March 2024.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://web.archive.org/web/20240327045948/https://energiaestrategica.es/forestalia-recibe-la-autorizacion-para-13-proyectos-renovables-por-mas-de-600-mw/. Archived from the original on 27 March 2024.
{{cite web}}
: Missing or empty|title=
(help)