Bustelo (Greenalia) wind farm

From Global Energy Monitor
This article is part of the
Global Wind Power Tracker, a Global Energy Monitor project.
Report an error

Other names: Greenalia Bustelo

Bustelo (Greenalia) wind farm is a wind farm in pre-construction in Carballo, A Coruña, Galicia, Spain.

Project Details

Table 1: Phase-level project details for Bustelo (Greenalia) wind farm

Status Nameplate capacity Type Owner Operator
Pre-construction[1] 45 MW[2] Onshore[2] Greenalia SA [100%][2] Greenalia Wind Power Bustelo SLU[3]

Location

Table 2: Phase-level location details for Bustelo (Greenalia) wind farm

Location Coordinates (WGS 84)
Carballo, A Coruña, Galicia, Spain[4] 43.4601, -7.7901 (approximate)[4]

The map below shows the approximate location of the wind farm:

Loading map...

Articles and Resources

Additional data

To access additional data, including an interactive map of global wind farms, a downloadable dataset, and summary data, please visit the Global Wind Power Tracker on the Global Energy Monitor website.

References

  1. https://www.poderjudicial.es/cgpj/es/Poder-Judicial/Noticias-Judiciales/El-TSXG-anula-la-autorizacion-de-la-Xunta-a-Greenalia-para-construir-el-parque-eolico-Bustelo--A-Coruna-, https://www.elcorreogallego.es/concellos/2023/06/21/justicia-anula-autorizacion-construccion-parque-88943946.html https://www.energyglobal.com/wind/31052022/siemens-gamesa-and-greenalia-install-three-wind-farms-in-spain/, https://www.poderjudicial.es/cgpj/es/Poder-Judicial/Noticias-Judiciales/El-TSXG-anula-la-autorizacion-de-la-Xunta-a-Greenalia-para-construir-el-parque-eolico-Bustelo--A-Coruna-, https://www.elcorreogallego.es/concellos/2023/06/21/justicia-anula-autorizacion-construccion-parque-88943946.html. {{cite web}}: Check |url= value (help); Missing or empty |title= (help)
  2. 2.0 2.1 2.2 https://web.archive.org/web/20240126043213/https://greenalia.es/en/articles/greenalia-obtains-the-administrative-licence-for-the-construction-of-45-mw-bustelo-wind-farm/. Archived from the original on 2024-01-26. {{cite web}}: Missing or empty |title= (help)
  3. https://web.archive.org/web/20240131074015/https://www.xunta.gal/dog/Publicados/2021/20210726/AnuncioG0596-020721-0004_es.html. Archived from the original on 2024-01-31. {{cite web}}: Missing or empty |title= (help)
  4. 4.0 4.1 https://web.archive.org/web/20240201004437/https://www.thewindpower.net/windfarm_en_28633.php. Archived from the original on 2024-02-01. {{cite web}}: Missing or empty |title= (help)