Célfiro wind farm
From Global Energy Monitor
This article is part of the Global Wind Power Tracker, a Global Energy Monitor project. |
Célfiro wind farm is a wind farm in pre-construction in Mazaleón, Teruel, Aragón, Spain.
Project Details
Table 1: Phase-level project details for Célfiro wind farm
Status | Commissioning year | Nameplate capacity | Type | Owner | Operator |
---|---|---|---|---|---|
Pre-construction[1] | 2023 (planned)[2] | 192 MW[1] | Onshore[1] | Capital Energy[3] | Green Capital Power[1] |
Location
Table 2: Phase-level location details for Célfiro wind farm
Location | Coordinates (WGS 84) |
---|---|
Mazaleón, Teruel, Aragón, Spain[4][1] | 41.0504, 0.1039 (approximate)[4] |
The map below shows the approximate location of the wind farm:
Articles and Resources
Additional data
To access additional data, including an interactive map of global wind farms, a downloadable dataset, and summary data, please visit the Global Wind Power Tracker on the Global Energy Monitor website.
References
- ↑ 1.0 1.1 1.2 1.3 1.4 (PDF) https://ia601505.us.archive.org/35/items/05062020-expedients-renovables-tramitacio/05062020-expedients-renovables-tramitacio.pdf.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://www.power-technology.com/marketdata/cefiro-wind-farm-spain/.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://www.evwind.es/2021/08/30/capital-energy-avanza-en-el-desarrollo-de-504-mw-de-energia-eolica-en-aragonCapital%20Energy%20advances%20in%20the%20development%20ofof%20wind%20energy%20in%20Aragon&text=C%C3%A9firo%2C%20Paucali%2C%20Arlo%20and%20Argestesalmost%20600%2C000%20tons%20of%20CO2.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 4.0 4.1 https://www.evwind.es/2021/08/30/capital-energy-avanza-en-el-desarrollo-de-504-mw-de-energia-eolica-en-aragon/82150.
{{cite web}}
: Missing or empty|title=
(help)