CAP Acero Huachipato steel plant

From Global Energy Monitor
(Redirected from CAP Acero steel plant)
This article is part of the
Global Steel Plant Tracker, a project of Global Energy Monitor.
Download full dataset
Report an error
Sub-articles:

CAP Acero Huachipato steel plant (Planta siderúrgica Huachipato (Spanish)) is a blast furnace-basic oxygen furnace (BF-BOF) steel plant operating in Talcahuano, Concepción, Chile.

Location

The map below shows the exact location of the plant in Talcahuano, Concepción, Chile:

Loading map...
  • Location: Av. Gran Bretaña 2910, Huachipato, Talcahuano, Chile
  • Coordinates (WGS 84): -36.746421, -73.129171 (exact)

Background

The CAP Acero steel plant, known in Spanish as Siderúrgica Huachipato, is Chile's only integrated steel mill.[1] It is owned and operated by Compañía Siderúrgica Huachipato S.A., the steelmaking division of Grupo CAP (Compañía de Acero del Pacífico, or Pacific Steel Company), a leader in Chile's iron mining and steel making industries.[2]

CAP was founded in 1946 as a joint venture between the Chilean government agency CORFO (33%), the Caja Autónoma de Amortización de la Deuda Pública (14%), and private shareholders (53%). The company, renamed Grupo de Empresas CAP in 1981, was entirely privatized in 1987.[3] Construction of the steel plant began in early 1947, and it was officially inaugurated on November 25, 1950.[4]

Since 1950 CAP has maintained its position as Chile's leading steel producer and processor, while steadily modernizing and upgrading its infrastructure.[1] [5] The plant's blast furnace/basic oxygen furnace system is fed with iron ore from CAP's own mines. The plant's continuous casting facilities and rolling mill transform the resulting steel into slabs, billets, and a variety of products destined for national and international markets, including cold- and hot-rolled steel, grinding bars, rebar, and wire rod for use in construction, mining and other industries.[6][7]

In 2013, the plant's blast furnace No. 2 was idled as part of a company-wide cost-cutting plan, but the furnace was reportedly brought back online in April 2019.[8]

2024 shutdown of operations

In 2024, competition from low-cost Chinese steel resulted in repeated shutdowns of the Huachipato plant. The plant initially ceased operations in March 2024, following a 44% year-over-year increase in Chinese imports between 2022 and 2023.[9] Chile's government responded by slapping tariffs on imported steel, allowing the plant to resume operations for several months, but in August 2024 the plant's owners announced renewed plans to cease production indefinitely.[9] In September 2024, the plant was shuttered, and the company reported that the shutdown would likely be permanent.[10]

Low-emissions/green steelmaking

This steel plant is associated with a green steel project tracked in the Green Steel Tracker. Details about the project are included below.

Table 1: Green Steel Project Details

All references for the above data are available in the Green Steel Tracker.
Project 1
Company Compania Siderurgica Huachipato SA
Company has climate goals? No
Location Hualpén, Chile
Project name H2V CAP
Project website Site
Project scale Pilot
Project status Announced
Year to be online 2030
Technology to be used H-DRI
Technology details Not stated
Iron production capacity (million tonnes per year) 0
Steel production capacity (million tonnes per year) Not stated
CO2 capture (million tonnes CO2 per year) Not applicable
Hydrogen generation capacity(MW) 17
Investment size 3.6
Partners Paul Wurth Italia SpA (SMS Group), Corfo
Date of announcement 2023-03-23

Plant Details

Table 2: General Plant Details

Plant status Start date Workforce size Iron ore source
Operating[11] 1950[12] 1193[13] El Romeral iron mine, other iron mines owned by CAP Minería[14]

Table 3: Ownership and Parent Company Information

Parent company Parent company PermID Parent company GEM ID Owner Owner company PermID Owner company GEM ID
CAP SA [100.0%] 4295863321 [100%] E100001000728 [100%] Compania Siderurgica Huachipato SA[15] 5000030020 E100000130911

Table 4: Process and Products

Steel product category Steel products Steel sector end users ISO 14001 ISO 50001 Main production equipment Detailed production equipment
finished rolled[15] grinding rods, wire rod, concrete reinforcing bars, special steels[11] automotive; building and infrastructure; tools and machinery[16] 1905-07-13 00:00:00[17] 1905-07-13 00:00:00[18] BF, BOF[19] coking plant (58 Otto Twin Flue vertical ovens, 1990); 2 BOF (1975)[19][20]

Table 5: Crude Steel Production Capacities (thousand tonnes per annum)

*Please see our Frequently Asked Questions page for an explanation of the different capacity operating statuses.
Capacity operating status* Basic oxygen furnace steelmaking capacity Nominal crude steel capacity (total)
operating 1450 TTPA[21][21] 1450 TTPA[21][21]

Table 6: Crude Iron Production Capacities (thousand tonnes per annum)

*Please see our Frequently Asked Questions page for an explanation of the different capacity operating statuses.
Capacity operating status* Blast furnace capacity Nominal iron capacity (total)
operating 1481 TTPA[22][23] 1481 TTPA[22][23]

Table 7: Upstream Products Production Capacities (thousand tonnes per annum)

Coke
500 TTPA[24][21]

Table 8: Actual Crude Steel Production by Year (thousand tonnes per annum)

Year BOF Production Total (all routes)
2020 801 TTPA[20] 801 TTPA[20]
2021 833 TTPA[25] 833 TTPA[25]
2022 701 TTPA[26][27] 701 TTPA

Table 9: Actual Crude Iron Production by Year (thousand tonnes per annum)

Year BF Production Total (all routes)
2020 664 TTPA[20][28] 664 TTPA[20]
2021 695 TTPA[27] 695 TTPA[28]
2022 625 TTPA[27] 625 TTPA

Blast Furnace Details

Table 10: Blast Furnace Details

Unit name Status Announced date Construction date Start date Furnace manufacturer and model Current size Current capacity (ttpa) Decarbonization technology Most recent relining
1 operating[29] unknown unknown 1950[19][20][30] Brassert[30] 755 m³[24] 730[22] unknown unknown
2 operating[29][19][20][31] unknown unknown 1966[19][20][30] Koppers[30] 881 m³[24] 751[23] unknown 2019-04[32]

Articles and Resources

Additional data

To access additional data, including an interactive map of steel power plants, a downloadable dataset, and summary data, please visit the Global Steel Plant Tracker on the Global Energy Monitor website.

References

  1. 1.0 1.1 "QUIENES SOMOS - CAP Acero". CAP Acero. Retrieved 2022-02-09.{{cite web}}: CS1 maint: url-status (link)
  2. CAP. "Operaciones: Líneas de Negocio: Siderurgia". CAP S.A. Retrieved 2020-09-15.{{cite web}}: CS1 maint: url-status (link)
  3. "CAP S.A." (PDF). Humphreys Clasificadora de Riesgo. April 2016.{{cite web}}: CS1 maint: url-status (link)
  4. "Historia de la Compañía de Acero del Pacífico, S.A. (p. 113 & p. 121)" (PDF). Memoria Chilena.{{cite web}}: CS1 maint: url-status (link)
  5. "CAP Chile". CAP S.A. Retrieved 2020-09-15.{{cite web}}: CS1 maint: url-status (link)
  6. "Infografia: Paso 7 Colada Continua, Paso 8 Laminación". CAP Acero. Retrieved 2020-09-15.{{cite web}}: CS1 maint: url-status (link)
  7. "Memoria Anual 2020" (PDF). CAP. March 30, 2021.{{cite web}}: CS1 maint: url-status (link)
  8. "Chilean steelmaker CAP restarts blast furnace after six years: sources". S&P Global Platts. April 30, 2019.{{cite web}}: CS1 maint: url-status (link)
  9. 9.0 9.1 Nugent, Ciara (2024-08-07). "Chile's largest steel mill shuts amid surge in Chinese imports". Financial Times.
  10. "La siderúrgica más grande de Chile pierde la batalla contra el acero chino y cierra tras 74 años". El Economista. 2024-09-16.{{cite web}}: CS1 maint: url-status (link)
  11. 11.0 11.1 https://web.archive.org/web/20220320141539/https://www.capacero.cl/cap_acero/site/edic/base/port/quienes_somos.html. Archived from the original on 20 March 2022. {{cite web}}: Missing or empty |title= (help)
  12. https://web.archive.org/web/20220318130308/https://www.capacero.cl/cap_acero/site/edic/base/port/empresa_historia.html. Archived from the original on 18 March 2022. {{cite web}}: Missing or empty |title= (help)
  13. https://web.archive.org/web/20210828174109/https://www.capacero.cl/cap_acero/site/edic/base/port/productos.html. Archived from the original on 28 August 2021. {{cite web}}: Missing or empty |title= (help)
  14. https://web.archive.org/web/20220124201943/https://es.wikipedia.org/wiki/CAP_%28empresa%29. Archived from the original on 24 January 2022. {{cite web}}: Missing or empty |title= (help)
  15. 15.0 15.1 https://web.archive.org/web/20210820223017/https://www.capacero.cl/cap_acero/quienes-somos/quienes-somos/2018-01-29/115836.html. Archived from the original on 20 August 2021. {{cite web}}: Missing or empty |title= (help)
  16. https://web.archive.org/web/20211216154731/https://www.capacero.cl/. Archived from the original on 16 December 2021. {{cite web}}: Missing or empty |title= (help)
  17. (PDF) https://web.archive.org/web/20220517233045/https://www.capacero.cl/cap_acero/site/artic/20171112/asocfile/20171112164017/iso_14001_espan__ol.pdf. Archived from the original (PDF) on 17 May 2022. {{cite web}}: Missing or empty |title= (help)
  18. (PDF) https://web.archive.org/web/20220517230531/https://www.capacero.cl/cap_acero/site/artic/20180628/asocfile/20180628134327/dnv_certificate_espan__ol_e.pdf. Archived from the original (PDF) on 17 May 2022. {{cite web}}: Missing or empty |title= (help)
  19. 19.0 19.1 19.2 19.3 19.4 https://web.archive.org/web/20220126233305/https://www.capacero.cl/cap_acero/site/edic/base/port/infografia.html. Archived from the original on 26 January 2022. {{cite web}}: Missing or empty |title= (help)
  20. 20.0 20.1 20.2 20.3 20.4 20.5 20.6 20.7 (PDF) https://web.archive.org/web/20220318134219/https://www.capacero.cl/cap_acero/site/artic/20210401/asocfile/20210401155954/memoria_acero_2020.pdf. Archived from the original (PDF) on 18 March 2022. {{cite web}}: Missing or empty |title= (help)
  21. 21.0 21.1 21.2 21.3 21.4 (PDF) https://www.capacero.cl/cap_acero/site/artic/20220325/asocfile/20220325225334/memoria_acero_2021.pdf. {{cite web}}: Missing or empty |title= (help)
  22. 22.0 22.1 22.2 https://web.archive.org/web/20220525045734/https://www.asimet.cl/cap-acero-alto-horno-estara-en-regimen-hacia-fin-de-mes/. Archived from the original on 25 May 2022. {{cite web}}: Missing or empty |title= (help)
  23. 23.0 23.1 23.2 (PDF) https://web.archive.org/web/20220127144916/https://www.capacero.cl/cap_acero/site/artic/20190903/asocfile/20190903103909/2219_revista_cap_acero_metalito_julio_agosto_2019.pdf. Archived from the original (PDF) on 27 January 2022. {{cite web}}: Missing or empty |title= (help)
  24. 24.0 24.1 24.2 https://web.archive.org/web/20240119051822/https://www.siderurgicahuachipato.cl/. Archived from the original (PDF) on 19 January 2024. {{cite web}}: Missing or empty |title= (help)
  25. 25.0 25.1 (PDF) https://web.archive.org/web/20220509133559/https://www.cap.cl/cap/site/artic/20220328/asocfile/20220328180913/memoria_integrada_cap_2021_15mb__1_.pdf. Archived from the original (PDF) on 09 May 2022. {{cite web}}: Check date values in: |archive-date= (help); Missing or empty |title= (help)
  26. (PDF) https://web.archive.org/web/20240111063948/https://www.cap.cl/cap/site/artic/20230329/asocfile/20230329182323/memoria_integrada_grupo_cap_2022.pdf. Archived from the original (PDF) on 11 January 2024. {{cite web}}: Missing or empty |title= (help)
  27. 27.0 27.1 27.2 (PDF) https://web.archive.org/web/20230307003012/https://cms.alacero.org/uploads/Alacero_America_latina_en_cifras_Espanhol_47683530c0.pdf. Archived from the original (PDF) on 07 March 2023. {{cite web}}: Check date values in: |archive-date= (help); Missing or empty |title= (help)
  28. 28.0 28.1 (PDF) https://web.archive.org/web/20220117191258/http://www.acero.org.ar/wp-content/uploads/2021/12/america_latina_en_cifras_2021_es-en_capa2_0.pdf. Archived from the original (PDF) on 17 January 2022. {{cite web}}: Missing or empty |title= (help)
  29. 29.0 29.1 (PDF) https://www.capacero.cl/cap_acero/site/artic/20231128/asocfile/20231128131304/2234_revista_sideru__rgica_huachipato_agosto_noviembre_2023pdf.pdf. {{cite web}}: Missing or empty |title= (help)
  30. 30.0 30.1 30.2 30.3 (PDF) http://repobib.ubiobio.cl/jspui/bitstream/123456789/2293/1/Sepulveda_Pino_Karina.pdf. {{cite web}}: Missing or empty |title= (help)
  31. https://web.archive.org/web/20220828131721/https://sabes.cl/2022/02/05/contingencia-en-horno-de-huachipato-en-talcahuano-genero-una-gran-nube-toxica/. Archived from the original on 28 August 2022. {{cite web}}: Missing or empty |title= (help)
  32. (PDF) https://web.archive.org/web/20230419171420/https://www.capacero.cl/cap_acero/site/artic/20200130/asocfile/20200130171905/2217_revista_cap_acero_metalito_enero_marz_2019.pdf. Archived from the original (PDF) on 19 April 2023. {{cite web}}: Missing or empty |title= (help)

Resources