CAP Acero Huachipato steel plant (Planta siderúrgica Huachipato (Spanish)) is a blast furnace-basic oxygen furnace (BF-BOF) steel plant operating in Talcahuano, Concepción, Chile.
Location
The map below shows the exact location of the plant in Talcahuano, Concepción, Chile:
- Location: Av. Gran Bretaña 2910, Huachipato, Talcahuano, Chile
- Coordinates (WGS 84): -36.746421, -73.129171 (exact)
Background
The CAP Acero steel plant, known in Spanish as Siderúrgica Huachipato, is Chile's only integrated steel mill.[1] It is owned and operated by Compañía Siderúrgica Huachipato S.A., the steelmaking division of Grupo CAP (Compañía de Acero del Pacífico, or Pacific Steel Company), a leader in Chile's iron mining and steel making industries.[2]
CAP was founded in 1946 as a joint venture between the Chilean government agency CORFO (33%), the Caja Autónoma de Amortización de la Deuda Pública (14%), and private shareholders (53%). The company, renamed Grupo de Empresas CAP in 1981, was entirely privatized in 1987.[3] Construction of the steel plant began in early 1947, and it was officially inaugurated on November 25, 1950.[4]
Since 1950 CAP has maintained its position as Chile's leading steel producer and processor, while steadily modernizing and upgrading its infrastructure.[1] [5] The plant's blast furnace/basic oxygen furnace system is fed with iron ore from CAP's own mines. The plant's continuous casting facilities and rolling mill transform the resulting steel into slabs, billets, and a variety of products destined for national and international markets, including cold- and hot-rolled steel, grinding bars, rebar, and wire rod for use in construction, mining and other industries.[6][7]
In 2013, the plant's blast furnace No. 2 was idled as part of a company-wide cost-cutting plan, but the furnace was reportedly brought back online in April 2019.[8]
Low-emissions/green steelmaking
This steel plant is associated with a green steel project tracked in the Green Steel Tracker. Details about the project are included below.
Table 1: Green Steel Project Details
Project 1 | |
---|---|
Company | Compania Siderurgica Huachipato SA |
Company has climate goals? | No |
Location | Hualpén, Chile |
Project name | H2V CAP |
Project website | Site |
Project scale | Pilot |
Project status | Announced |
Year to be online | 2030 |
Technology to be used | H-DRI |
Technology details | Not stated |
Iron production capacity (million tonnes per year) | 0 |
Steel production capacity (million tonnes per year) | Not stated |
CO2 capture (million tonnes CO2 per year) | Not applicable |
Hydrogen generation capacity(MW) | 17 |
Investment size | 3.6 |
Partners | Paul Wurth Italia SpA (SMS Group), Corfo |
Date of announcement | 2023-03-23 |
Plant Details
Table 2: General Plant Details
Plant status | Start date | Workforce size | Iron ore source |
---|---|---|---|
Operating[9] | 1950[10] | 1193[11] | El Romeral iron mine, other iron mines owned by CAP Minería[12] |
Table 3: Ownership and Parent Company Information
Parent company | Parent company PermID | Parent company GEM ID | Owner | Owner company PermID | Owner company GEM ID |
---|---|---|---|---|---|
CAP SA [100.0%] | 4295863321 [100%] | E100001000728 [100%] | Compania Siderurgica Huachipato SA[13] | 5000030020 | E100000130911 |
Table 4: Process and Products
Steel product category | Steel products | Steel sector end users | ISO 14001 | ISO 50001 | Main production equipment | Detailed production equipment |
---|---|---|---|---|---|---|
finished rolled[13] | grinding rods, wire rod, concrete reinforcing bars, special steels[9] | automotive; building and infrastructure; tools and machinery[14] | 1905-07-13 00:00:00[15] | 1905-07-13 00:00:00[16] | BF, BOF[17] | coking plant (58 Otto Twin Flue vertical ovens, 1990); 2 BOF (1975)[17][18] |
Table 5: Crude Steel Production Capacities (thousand tonnes per annum)
Capacity operating status* | Basic oxygen furnace steelmaking capacity | Nominal crude steel capacity (total) |
---|---|---|
operating | 1450 TTPA[19][19] | 1450 TTPA[19][19] |
Table 6: Crude Iron Production Capacities (thousand tonnes per annum)
Capacity operating status* | Blast furnace capacity | Nominal iron capacity (total) |
---|---|---|
operating | 1481 TTPA[20][21] | 1481 TTPA[20][21] |
Table 7: Upstream Products Production Capacities (thousand tonnes per annum)
Coke |
---|
500 TTPA[22][19] |
Table 8: Actual Crude Steel Production by Year (thousand tonnes per annum)
Year | BOF Production | Total (all routes) |
---|---|---|
2020 | 801 TTPA[18] | 801 TTPA[18] |
2021 | 833 TTPA[23] | 833 TTPA[23] |
2022 | 701 TTPA[24][25] | 701 TTPA |
Table 9: Actual Crude Iron Production by Year (thousand tonnes per annum)
Year | BF Production | Total (all routes) |
---|---|---|
2020 | 664 TTPA[18][26] | 664 TTPA[18] |
2021 | 695 TTPA[25] | 695 TTPA[26] |
2022 | 625 TTPA[25] | 625 TTPA |
Blast Furnace Details
Table 10: Blast Furnace Details
Unit name | Status | Announced date | Construction date | Start date | Furnace manufacturer and model | Current size | Current capacity (ttpa) | Decarbonization technology | Most recent relining |
---|---|---|---|---|---|---|---|---|---|
1 | operating[27] | unknown | unknown | 1950[17][18][28] | Brassert[28] | 755 m³[22] | 730[20] | unknown | unknown |
2 | operating[27][17][18][29] | unknown | unknown | 1966[17][18][28] | Koppers[28] | 881 m³[22] | 751[21] | unknown | 2019-04[30] |
Articles and Resources
Additional data
To access additional data, including an interactive map of steel power plants, a downloadable dataset, and summary data, please visit the Global Steel Plant Tracker on the Global Energy Monitor website.
References
- ↑ 1.0 1.1 "QUIENES SOMOS - CAP Acero". CAP Acero. Retrieved 2022-02-09.
{{cite web}}
: CS1 maint: url-status (link) - ↑ CAP. "Operaciones: Líneas de Negocio: Siderurgia". CAP S.A. Retrieved 2020-09-15.
{{cite web}}
: CS1 maint: url-status (link) - ↑ "CAP S.A." (PDF). Humphreys Clasificadora de Riesgo. April 2016.
{{cite web}}
: CS1 maint: url-status (link) - ↑ "Historia de la Compañía de Acero del Pacífico, S.A. (p. 113 & p. 121)" (PDF). Memoria Chilena.
{{cite web}}
: CS1 maint: url-status (link) - ↑ "CAP Chile". CAP S.A. Retrieved 2020-09-15.
{{cite web}}
: CS1 maint: url-status (link) - ↑ "Infografia: Paso 7 Colada Continua, Paso 8 Laminación". CAP Acero. Retrieved 2020-09-15.
{{cite web}}
: CS1 maint: url-status (link) - ↑ "Memoria Anual 2020" (PDF). CAP. March 30, 2021.
{{cite web}}
: CS1 maint: url-status (link) - ↑ "Chilean steelmaker CAP restarts blast furnace after six years: sources". S&P Global Platts. April 30, 2019.
{{cite web}}
: CS1 maint: url-status (link) - ↑ 9.0 9.1 https://web.archive.org/web/20220320141539/https://www.capacero.cl/cap_acero/site/edic/base/port/quienes_somos.html. Archived from the original on 20 March 2022.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://web.archive.org/web/20220318130308/https://www.capacero.cl/cap_acero/site/edic/base/port/empresa_historia.html. Archived from the original on 18 March 2022.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://web.archive.org/web/20210828174109/https://www.capacero.cl/cap_acero/site/edic/base/port/productos.html. Archived from the original on 28 August 2021.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://web.archive.org/web/20220124201943/https://es.wikipedia.org/wiki/CAP_%28empresa%29. Archived from the original on 24 January 2022.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 13.0 13.1 https://web.archive.org/web/20210820223017/https://www.capacero.cl/cap_acero/quienes-somos/quienes-somos/2018-01-29/115836.html. Archived from the original on 20 August 2021.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://web.archive.org/web/20211216154731/https://www.capacero.cl/. Archived from the original on 16 December 2021.
{{cite web}}
: Missing or empty|title=
(help) - ↑ (PDF) https://web.archive.org/web/20220517233045/https://www.capacero.cl/cap_acero/site/artic/20171112/asocfile/20171112164017/iso_14001_espan__ol.pdf. Archived from the original (PDF) on 17 May 2022.
{{cite web}}
: Missing or empty|title=
(help) - ↑ (PDF) https://web.archive.org/web/20220517230531/https://www.capacero.cl/cap_acero/site/artic/20180628/asocfile/20180628134327/dnv_certificate_espan__ol_e.pdf. Archived from the original (PDF) on 17 May 2022.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 17.0 17.1 17.2 17.3 17.4 https://web.archive.org/web/20220126233305/https://www.capacero.cl/cap_acero/site/edic/base/port/infografia.html. Archived from the original on 26 January 2022.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 18.0 18.1 18.2 18.3 18.4 18.5 18.6 18.7 (PDF) https://web.archive.org/web/20220318134219/https://www.capacero.cl/cap_acero/site/artic/20210401/asocfile/20210401155954/memoria_acero_2020.pdf. Archived from the original (PDF) on 18 March 2022.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 19.0 19.1 19.2 19.3 19.4 (PDF) https://www.capacero.cl/cap_acero/site/artic/20220325/asocfile/20220325225334/memoria_acero_2021.pdf.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 20.0 20.1 20.2 https://web.archive.org/web/20220525045734/https://www.asimet.cl/cap-acero-alto-horno-estara-en-regimen-hacia-fin-de-mes/. Archived from the original on 25 May 2022.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 21.0 21.1 21.2 (PDF) https://web.archive.org/web/20220127144916/https://www.capacero.cl/cap_acero/site/artic/20190903/asocfile/20190903103909/2219_revista_cap_acero_metalito_julio_agosto_2019.pdf. Archived from the original (PDF) on 27 January 2022.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 22.0 22.1 22.2 https://web.archive.org/web/20240119051822/https://www.siderurgicahuachipato.cl/. Archived from the original (PDF) on 19 January 2024.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 23.0 23.1 (PDF) https://web.archive.org/web/20220509133559/https://www.cap.cl/cap/site/artic/20220328/asocfile/20220328180913/memoria_integrada_cap_2021_15mb__1_.pdf. Archived from the original (PDF) on 09 May 2022.
{{cite web}}
: Check date values in:|archive-date=
(help); Missing or empty|title=
(help) - ↑ (PDF) https://web.archive.org/web/20240111063948/https://www.cap.cl/cap/site/artic/20230329/asocfile/20230329182323/memoria_integrada_grupo_cap_2022.pdf. Archived from the original (PDF) on 11 January 2024.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 25.0 25.1 25.2 (PDF) https://web.archive.org/web/20230307003012/https://cms.alacero.org/uploads/Alacero_America_latina_en_cifras_Espanhol_47683530c0.pdf. Archived from the original (PDF) on 07 March 2023.
{{cite web}}
: Check date values in:|archive-date=
(help); Missing or empty|title=
(help) - ↑ 26.0 26.1 (PDF) https://web.archive.org/web/20220117191258/http://www.acero.org.ar/wp-content/uploads/2021/12/america_latina_en_cifras_2021_es-en_capa2_0.pdf. Archived from the original (PDF) on 17 January 2022.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 27.0 27.1 (PDF) https://www.capacero.cl/cap_acero/site/artic/20231128/asocfile/20231128131304/2234_revista_sideru__rgica_huachipato_agosto_noviembre_2023pdf.pdf.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 28.0 28.1 28.2 28.3 (PDF) http://repobib.ubiobio.cl/jspui/bitstream/123456789/2293/1/Sepulveda_Pino_Karina.pdf.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://web.archive.org/web/20220828131721/https://sabes.cl/2022/02/05/contingencia-en-horno-de-huachipato-en-talcahuano-genero-una-gran-nube-toxica/. Archived from the original on 28 August 2022.
{{cite web}}
: Missing or empty|title=
(help) - ↑ (PDF) https://web.archive.org/web/20230419171420/https://www.capacero.cl/cap_acero/site/artic/20200130/asocfile/20200130171905/2217_revista_cap_acero_metalito_enero_marz_2019.pdf. Archived from the original (PDF) on 19 April 2023.
{{cite web}}
: Missing or empty|title=
(help)