CCC Riviera Maya (Valladolid) power station
Part of the Global Oil and Gas Plant Tracker, a Global Energy Monitor project. |
Related categories: |
CCC Riviera Maya (Valladolid) power station (Central CC Riviera Maya (Valladolid IV)) is a power station under construction in Valladolid, Yucatán, Mexico. It is also known as CCC Valladolid, Valladolid IV.
Location
Table 1: Project-level location details
Plant name | Location | Coordinates (WGS 84) |
---|---|---|
CCC Riviera Maya (Valladolid) power station | Valladolid, Yucatán, Mexico | 20.697929, -88.269832 (approximate)[1][2] |
The map below shows the approximate location of the power station.
Project Details
Table 2: Unit-level details
Unit name | Status | Fuel(s) | Capacity (MW) | Technology | CHP | Start year | Retired year |
---|---|---|---|---|---|---|---|
Unit 1 | construction[3][4][5][6][7] | fossil liquids - diesel, fossil gas - natural gas[8][1] | 1037[9] | combined cycle[6][8][1] | – | 2025[6][10] | – |
CHP is an abbreviation for Combined Heat and Power. It is a technology that produces electricity and thermal energy at high efficiencies. Coal units track this information in the Captive Use section when known.
Table 3: Unit-level ownership and operator details
Unit name | Owner | Parent |
---|---|---|
Unit 1 | Comisión Federal de Electricidad EPE [100%] | Comisión Federal de Electricidad EPE |
Background
In February 2022, Mexico's Federal Electricity Commission (CFE) awarded contracts to the Spanish companies Técnicas Reunidas and TSK for design and execution of the plant, with the Japanese company Mitsubishi Power providing the turbine technology.[11]
Articles and Resources
References
- ↑ 1.0 1.1 1.2 (PDF) https://web.archive.org/web/20240125094028/https://www.gob.mx/cms/uploads/attachment/file/611038/Cap7_-_PAMRNT_WEB.pdf. Archived from the original (PDF) on 25 January 2024.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://web.archive.org/web/20240125143432/https://www.google.com/maps/place/CCC+RIVIERA+MAYA/@20.6977687,-88.2699473,121m/data=!3m1!1e3!4m6!3m5!1s0x8f510d34d6d28263:0xfb477c58e8c5be24!8m2!3d20.6978889!4d-88.2698333!16s%2Fg%2F11l1n8d43j?entry=tts. Archived from the original on 25 January 2024.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://web.archive.org/web/20240125110429/https://energiaadebate.com/confirma-vila-construccion-de-ciclos-combinados-en-yucatan/. Archived from the original on 25 January 2024.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://web.archive.org/web/20240125110504/https://www.desdeelbalcon.com/inicia-construccion-de-dos-plantas-de-ciclo-combinado/. Archived from the original on 25 January 2024.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://web.archive.org/web/20240125110653/https://www.yucatan.com.mx/yucatan/2023/5/11/sin-avances-la-planta-de-energia-para-valladolid-404526.html. Archived from the original on 25 January 2024.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 6.0 6.1 6.2 (PDF) https://web.archive.org/web/20240125141014/https://www.cfe.mx/finanzas/reportes-financieros/Informe%20Anual%20Documentos/Informe%20Anual%20Portal.pdf. Archived from the original (PDF) on 25 January 2024.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://web.archive.org/web/20240125143324/https://www.yucatan.com.mx/yucatan/2023/03/23/llegan-calderas-para-la-planta-termoelectrica-de-valladolid-393289.html. Archived from the original on 25 January 2024.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 8.0 8.1 (PDF) https://web.archive.org/web/20240125143337/https://apps1.semarnat.gob.mx:8443/dgiraDocs/documentos/yuc/estudios/2021/31YU2021E0026.pdf. Archived from the original (PDF) on 25 January 2024.
{{cite web}}
: Missing or empty|title=
(help) - ↑ (PDF) https://web.archive.org/web/20240125102753/https://www.cfe.mx/finanzas/Documents/Plan_Negocios_2023-2027.pdf. Archived from the original (PDF) on 25 January 2024.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://web.archive.org/web/20240125103333/https://energyandcommerce.com.mx/cfe-construye-2-centrales-electricas-para-peninsula-de-yucatan/. Archived from the original on 25 January 2024.
{{cite web}}
: Missing or empty|title=
(help) - ↑ "Técnicas Reunidas consigue un contrato de 335 millones de dólares para el desarrollo de dos ciclos combinados en México". Técnicas Reunidas. February 7, 2022.
{{cite web}}
: CS1 maint: url-status (link)
Additional data
To access additional data, including an interactive map of gas-fired power stations, a downloadable dataset, and summary data, please visit the Global Oil and Gas Plant Tracker on the Global Energy Monitor website.