CNOOC Shenzhen power plant (中海油深圳电厂, 中海油深圳电厂升级项目(Unit 5 and Unit 6)) is an operating power station of at least 595-megawatts (MW) in Dapeng, Dapeng District, Shenzhen, Guangdong, China with multiple units, some of which are not currently operating. It is also known as 深圳福华德电力, Shenzheng Fuhuade Power Station.

Location

Table 1: Project-level location details

Plant name Location Coordinates (WGS 84)
CNOOC Shenzhen power plant Dapeng, Dapeng District, Shenzhen, Guangdong, China 22.557412, 114.491833 (exact)[1][2][3]

The map below shows the exact location of the power station.

Loading map...


Unit-level coordinates (WGS 84):

  • 1, 2, 3, 4, 5, 6: 22.557412, 114.491833

Project Details

Table 2: Unit-level details

Unit name Status Fuel(s) Capacity (MW) Technology CHP Start year
1 Operating[4] fossil gas: natural gas[5] 235[4] combined cycle[4] not found 2003[4]
2 Operating[4] fossil gas: natural gas, fossil liquids: fuel oil[5] 360[4] combined cycle[4] not found 2005[4]
3 Shelved inferred May 2024) fossil gas: natural gas[1] 490[1] combined cycle[1] not found
4 Shelved inferred May 2024) fossil gas: natural gas[1] 490[1] combined cycle[1] not found
5 Construction[6][7] fossil gas: natural gas, other: hydrogen (unknown)[6][7] 530[6] combined cycle[6] not found
6 Construction[6][7] fossil gas: natural gas, other: hydrogen (unknown)[6][7] 530[8] combined cycle[6] not found

CHP is an abbreviation for Combined Heat and Power. It is a technology that produces electricity and thermal energy at high efficiencies. Coal units track this information in the Captive Use section when known.

Table 3: Unit-level ownership and operator details

Unit name Owner Parent
1 CNOOC Shenzhen Electric Power Co Ltd [100%][6][9][7][10][1] China National Offshore Oil Corp [100.0%]
2 CNOOC Shenzhen Electric Power Co Ltd [100%][6][9][7][10][1] China National Offshore Oil Corp [100.0%]
3 CNOOC Shenzhen Electric Power Co Ltd [100%][6][9][7][10][1] China National Offshore Oil Corp [100.0%]
4 CNOOC Shenzhen Electric Power Co Ltd [100%][6][9][7][10][1] China National Offshore Oil Corp [100.0%]
5 CNOOC Shenzhen Electric Power Co Ltd [100%][6][9][7][10][1] China National Offshore Oil Corp [100.0%]
6 CNOOC Shenzhen Electric Power Co Ltd [100%][6][9][7][10][1] China National Offshore Oil Corp [100.0%]

Background

Unit 1 began operation in May 2003. [11]

Unit 2 started operating in May 2005. [11]

Unit 5 and Unit 6 entered the construction phase on December 29, 2022. This project is constructed to high standards with a focus on advanced technology, low carbon, and environmental sustainability. It incorporates the use of hydrogen blending, natural gas hydrogen production, natural gas fuel cell power stations, carbon capture and utilization (CCUS), as well as the addition of small-scale photovoltaics, energy storage, and black start technologies. These measures aim to reduce carbon emissions intensity and achieve carbon peak and carbon neutrality goals step by step and in stages. The project will also serve as an important model for innovation in the smart power plant industry.[12]

Articles and Resources

References

  1. 1.00 1.01 1.02 1.03 1.04 1.05 1.06 1.07 1.08 1.09 1.10 1.11 1.12 https://web.archive.org/web/20220404235247/https://buy.cnooc.com.cn/cbjyweb/001/001001/20210914/a6e79b5d-b5bc-4d29-b4d4-011438e34d9b.html. Archived from the original on 04 April 2022. {{cite web}}: Check date values in: |archive-date= (help); Missing or empty |title= (help)
  2. https://web.archive.org/web/20240507021856/http://www.ggzy.gov.cn/information/html/a/440000/0101/202404/27/0044565378e5280941249a0fdac546dd4b20.shtml. Archived from the original on 07 May 2024. {{cite web}}: Check date values in: |archive-date= (help); Missing or empty |title= (help)
  3. http://www.sz.gov.cn/szzt2010/wgkzl/glgk/jgxxgk/gtzy/content/post_10251365.html. {{cite web}}: Missing or empty |title= (help)
  4. 4.0 4.1 4.2 4.3 4.4 4.5 4.6 4.7 https://web.archive.org/web/20211121051617/https://news.bjx.com.cn/html/20180906/926153.shtml. Archived from the original on 21 November 2021. {{cite web}}: Missing or empty |title= (help)
  5. 5.0 5.1 https://web.archive.org/web/20211127121133/https://news.bjx.com.cn/html/20180906/926153-4.shtml. Archived from the original on 27 November 2021. {{cite web}}: Missing or empty |title= (help)
  6. 6.00 6.01 6.02 6.03 6.04 6.05 6.06 6.07 6.08 6.09 6.10 6.11 6.12 https://web.archive.org/web/20240507021822/http://drc.gd.gov.cn/xmgg/content/post_4395357.html. Archived from the original on 07 May 2024. {{cite web}}: Check date values in: |archive-date= (help); Missing or empty |title= (help)
  7. 7.0 7.1 7.2 7.3 7.4 7.5 7.6 7.7 7.8 7.9 https://web.archive.org/web/20230306154452/https://finance.sina.com.cn/jjxw/2022-12-29/doc-imxykkha9391211.shtml. Archived from the original on 06 March 2023. {{cite web}}: Check date values in: |archive-date= (help); Missing or empty |title= (help)
  8. https://www.sohu.com/a/677879726_121687414. {{cite web}}: Missing or empty |title= (help)
  9. 9.0 9.1 9.2 9.3 9.4 9.5 https://web.archive.org/web/20211127121133/https://news.bjx.com.cn/html/20180906/926153-4.shtml. Archived from the original on 27 November 2021. {{cite web}}: Missing or empty |title= (help)
  10. 10.0 10.1 10.2 10.3 10.4 10.5 https://www.qcc.com/firm/52V0AE3.shtml. {{cite web}}: Missing or empty |title= (help)
  11. 11.0 11.1 "广东省57家燃机发电项目 136台机组汇总". 2018-09-06. Retrieved 2023-10-19.{{cite web}}: CS1 maint: url-status (link)
  12. "总投资27亿元!中海油2×500MW燃气发电升级项目正式开工". 2022-12-30. Retrieved 2023-10-19.{{cite web}}: CS1 maint: url-status (link)