CPI Wuwei Liangzhou power station (国家电投武威煤电项目) is a cancelled power station in Huangyang Town, Liangzhou District, Wuwei, Gansu, China.
Location
Table 1: Project-level location details
Plant name | Location | Coordinates (WGS 84) |
---|---|---|
CPI Wuwei Liangzhou power station | Huangyang Town, Liangzhou District, Wuwei, Gansu, China | 37.671429, 102.826698 (approximate) |
The map below shows the approximate location of the power station.
Project Details
Table 2: Unit-level details
Unit name | Status | Fuel(s) | Capacity (MW) | Technology |
---|---|---|---|---|
Unit 1 | cancelled | coal: unknown | 1000 | unknown |
Unit 2 | cancelled | coal: unknown | 1000 | unknown |
Table 3: Unit-level ownership and operator details
Unit name | Owner | Parent |
---|---|---|
Unit 1 | State Power Investment Group Upper Yellow River Hydropower Development Co Ltd [100%] | State Power Investment Corp Ltd [94.2%]; other [5.8%] |
Unit 2 | State Power Investment Group Upper Yellow River Hydropower Development Co Ltd [100%] | State Power Investment Corp Ltd [94.2%]; other [5.8%] |
Background on Project
Huanghe Hydropower Development Co. is sponsoring a coal-fired power plant with a total planned capacity of 2,000 MW in Gansu Province.[1][2] The project was in feasibility study stage in 2014.[3]
In 2015 Huanghe Hydropower Development Co. prepared for EIA clearance.[4] However, the project was not listed in the "13th 5-Year Plan of Energy Development in Gansu Province" and is therefore unlikely to be developed.[5]
2016: Nationwide Restrictions Imposed on Development of Coal-Fired Power Capacity
Due to new restrictions announced during 2016 by the National Energy Administration and the National Development and Reform Commission, further capacity expansions at this location appear to be on hold or cancelled. For details, see China's 2016 Restrictions on Development of Coal-Fired Power Capacity.
Ownership
In July 2015, China Power Investment Corporation (CPI) and State Nuclear Power Technology Corporation (SNPTC) merged to become State Power Investment Corporation (国家电力投资集团), one of the five largest state-owned electricity producers in the People's Republic of China.[6]
Articles and Resources
References
- ↑ “中电投武威电厂项目前期工作有序推进,” 武威项目库, 2011-08-12
- ↑ “武威火电项目通过集团公司立项审查,” 中电投集团 黄河公司陇电分公司, 2012-11-13
- ↑ "中电投武威电厂2×1000MW工程可研报告审查会召开," 甘肃黄河水电公司, 2014-04-14
- ↑ "中电投武威电厂新建工程环境影响评价第一次公众参与信息公示"甘肃黄河水电有限责任公司武威火电项目筹建处 2015-01-22
- ↑ "甘肃省人民政府办公厅关于印发《甘肃省“十三五”能源发展规划》的通知"Gansu Provincial Government Office, 2017-09-12
- ↑ "Chinese nuclear giant officially launched". World Nuclear Association. 16 July 2015. Retrieved 4 May 2015.
Additional data
To access additional data, including an interactive map of coal-fired power stations, a downloadable dataset, and summary data, please visit the Global Coal Plant Tracker on the Global Energy Monitor website.