CS-12-Ust-Vym-Chasovo-Zelenets-Syktyvkar Gas Pipeline
Part of the Global Gas Infrastructure Tracker, a Global Energy Monitor project. |
Related categories: |
CS-12-Ust-Vym-Chasovo-Zelenets-Syktyvkar Gas Pipeline (Russian: КС-12 - Усть-Вымь - Часово - Зеленец - Сыктывкар; Газопровод-отвод и ГРС-2 Эжва Республика Коми) is a proposed gas pipeline in Russia.[1]
Location
The pipeline is proposed to run from Compressor Station # 12 near Ust-Vym, Ust-Vymsky District, Komi Republic, to Chasovo, Zelenets, and on to a gas distribution station in Syktyvkar, Syktyvdinsky District, Komi Republic, Russia.
Project details
- Operator:
- Owner: Gazprom[1]
- Parent company: Gazprom
- Capacity: 0.464 bcm/year[2]
- Length:
- Diameter:
- Status: Proposed[1]
- Start year:
- Cost:
- Financing:
- Associated infrastructure: Ukhta-Torzhok Gas Pipeline, Vylgort-Pazhga Gas Pipeline, Pazhga-Vizinga Gas Pipeline
Background
The pipeline was included in the gasification program of Gazprom for 2021-2025 for the Komi Republic.[1] The pipeline will start at Compressor Station # 12 (Russian: "КС-12 Микунь"), which is part of the Ukhta-Torzhok Gas Pipeline.[3] The pipeline would mostly run parallel to the already existing pipeline, deviating to the west on Zelenets-Syktyvkar section. The pipeline was expected to be commissioned in 2022.[4] As of July 2023, the updated gasification program of Gazprom for the Komi Republic still includes the project as planned.[1]
Articles and resources
References
- ↑ 1.0 1.1 1.2 1.3 1.4 "Программа газификации 2021–2025 в Республике Коми". Gazprommap.ru. 2022. Retrieved Jul 21, 2022.
{{cite web}}
: CS1 maint: url-status (link) - ↑ Правительство Российской Федерации: Распоряжение от 25 ноября 2021 г. №3326-р. 2021. p. 12.
- ↑ "Компрессорная станция г. Микунь". ПК Стальконструкция. Retrieved August 2, 2023.
{{cite web}}
: CS1 maint: url-status (link) - ↑ "«Газпром межрегионгаз» строит в Воркуте газопровод-отвод и ГРС-2". In-power.ru. March 12, 2021. Retrieved July 25, 2023.
{{cite web}}
: CS1 maint: url-status (link)