CS-12-Ust-Vym-Chasovo-Zelenets-Syktyvkar Gas Pipeline

From Global Energy Monitor
Part of the
Global Gas Infrastructure Tracker,
a Global Energy Monitor project.
Download full dataset
Report an error
Related categories:

CS-12-Ust-Vym-Chasovo-Zelenets-Syktyvkar Gas Pipeline (Russian: КС-12 - Усть-Вымь - Часово - Зеленец - Сыктывкар; Газопровод-отвод и ГРС-2 Эжва Республика Коми) is a proposed gas pipeline in Russia.[1]

Location

The pipeline is proposed to run from Compressor Station # 12 near Ust-Vym, Ust-Vymsky District, Komi Republic, to Chasovo, Zelenets, and on to a gas distribution station in Syktyvkar, Syktyvdinsky District, Komi Republic, Russia.

Loading map...

Project details

Background

The pipeline was included in the gasification program of Gazprom for 2021-2025 for the Komi Republic.[1] The pipeline will start at Compressor Station # 12 (Russian: "КС-12 Микунь"), which is part of the Ukhta-Torzhok Gas Pipeline.[3] The pipeline would mostly run parallel to the already existing pipeline, deviating to the west on Zelenets-Syktyvkar section. The pipeline was expected to be commissioned in 2022.[4] As of July 2023, the updated gasification program of Gazprom for the Komi Republic still includes the project as planned.[1]

Articles and resources

References

  1. 1.0 1.1 1.2 1.3 1.4 "Программа газификации 2021–2025 в Республике Коми". Gazprommap.ru. 2022. Retrieved Jul 21, 2022.{{cite web}}: CS1 maint: url-status (link)
  2. Правительство Российской Федерации: Распоряжение от 25 ноября 2021 г. №3326-р. 2021. p. 12.
  3. "Компрессорная станция г. Микунь". ПК Стальконструкция. Retrieved August 2, 2023.{{cite web}}: CS1 maint: url-status (link)
  4. "«Газпром межрегионгаз» строит в Воркуте газопровод-отвод и ГРС-2". In-power.ru. March 12, 2021. Retrieved July 25, 2023.{{cite web}}: CS1 maint: url-status (link)