Cabanaconde geothermal power plant (Central geotérmica Cabanaconde) is a geothermal power plant in pre-construction in Cabanaconde, Caylloma, Arequipa, Peru.
Project Details
Table 1: Unit-level project details for Cabanaconde geothermal power plant
Status | Commissioning year | Nameplate capacity | Technology | Owner | Operator |
---|---|---|---|---|---|
Pre-construction[1] | 2027 (planned)[1] | 100 MW[2] | Unknown type | Energy Development CORP (EDC) [100%][2] | Energy Development CORP (EDC)[2] |
Location
Table 2: Unit-level location details for Cabanaconde geothermal power plant
Location | Coordinates (WGS 84) |
---|---|
Cabanaconde, Caylloma, Arequipa, Peru | -15.622, -71.9798 (approximate) |
The map below shows the approximate location of the geothermal power plant:
Articles and Resources
Additional data
To access additional data, including an interactive map of global geothermal power plants, a downloadable dataset, and summary data, please visit the Global Geothermal Power Tracker on the Global Energy Monitor website.
References
- ↑ 1.0 1.1 https://web.archive.org/web/20240319071829/https://www.power-technology.com/data-insights/power-plant-profile-cabanaconde-geothermal-power-plant-peru/. Archived from the original on 19 March 2024.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 2.0 2.1 2.2 https://web.archive.org/web/20221003170259/https://www.thinkgeoenergy.com/challenges-remain-for-geothermal-development-in-southern-peru/. Archived from the original on 03 October 2022.
{{cite web}}
: Check date values in:|archive-date=
(help); Missing or empty|title=
(help)