Cabazon wind farm
From Global Energy Monitor
This article is part of the Global Wind Power Tracker, a Global Energy Monitor project. |
Other names: Cabazon Wind Partners (Phase 2), GPS Cabazon Wind LLC (Phase 1)
Cabazon wind farm is an operating wind farm in Riverside County, California, United States.
Project Details
Table 1: Phase-level project details for Cabazon wind farm
Phase name | Status | Commissioning year | Nameplate capacity | Type | Owner | Operator |
---|---|---|---|---|---|---|
1 | Operating[1] | 1999[1] | 40 MW[2] | Onshore[2] | GlidePath [100%][3] | – |
2 | Operating[1] | 2002[1] | 41 MW[2] | Onshore[2] | NextEra Energy Inc [100%][4] | NextEra Energy[4] |
Location
Table 2: Phase-level location details for Cabazon wind farm
Phase Name | Location | Coordinates (WGS 84) |
---|---|---|
1 | Riverside County, California, United States[2] | 33.911, -116.702 (exact)[2] |
2 | Riverside County, California, United States[2] | 33.9166, -116.729 (exact)[2] |
The map below shows the exact locations of the wind farm phases:
Articles and Resources
Additional data
To access additional data, including an interactive map of global wind farms, a downloadable dataset, and summary data, please visit the Global Wind Power Tracker on the Global Energy Monitor website.
References
- ↑ 1.0 1.1 1.2 1.3 https://web.archive.org/web/20221028021258/https://www.eia.gov/electricity/data/eia860/. Archived from the original on 28 October 2022.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 2.0 2.1 2.2 2.3 2.4 2.5 2.6 2.7 https://doi.org/10.5066/F7TX3DN0.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://web.archive.org/web/20240131092219/https://openei.org/wiki/Cabazon_Wind_Farm_I. Archived from the original on 31 January 2024.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 4.0 4.1 (PDF) https://web.archive.org/web/20240131004034/https://www.nexteraenergyresources.com/content/dam/neer/us/en/pdf/portfolio/Cabazon.pdf. Archived from the original (PDF) on 31 January 2024.
{{cite web}}
: Missing or empty|title=
(help)