Cabecero wind farm
From Global Energy Monitor
This article is part of the Global Wind Power Tracker, a Global Energy Monitor project. |
Other names: Maestrazgo project, Clúster Maestrazgo
Cabecero wind farm (Parque eólico Cabecero) is a wind farm in pre-construction in Fortanete, Teruel, Aragón, Spain.
Project Details
Table 1: Phase-level project details for Cabecero wind farm
Phase name | Status | Nameplate capacity | Type | Owner | Operator |
---|---|---|---|---|---|
1 | Shelved[1] | 39 MW[2] | Onshore[2] | Forestalia SL [100%][3][4] | Energías Renovables de Ormuz[1][2] |
2 | Pre-construction[3][5][2][1][4] | 42 MW[1][5] | Onshore[1] | Forestalia SL [100%][3][4] | Energías Renovables de Ormuz[1][2] |
3 | Pre-construction[1][6][2] | 37 MW[1][6] | Onshore[1] | Forestalia SL [100%][3][4] | Energías Renovables de Ormuz[1][2] |
4 | Pre-construction[1][7][2] | 37 MW[1][7] | Onshore[1] | Forestalia SL [100%][3][4] | Energías Renovables de Ormuz[1][2] |
Location
Table 2: Phase-level location details for Cabecero wind farm
Phase Name | Location | Coordinates (WGS 84) |
---|---|---|
1 | Fortanete, Teruel, Aragón, Spain[1] | 40.462282, -0.518886 (approximate)[1] |
2 | Fortanete, Teruel, Aragón, Spain[1] | 40.462282, -0.518886 (approximate)[1] |
3 | Fortanete, Teruel, Aragón, Spain[1] | 40.462282, -0.518886 (approximate)[1] |
4 | Fortanete, Teruel, Aragón, Spain[1] | 40.462282, -0.518886 (approximate)[1] |
The map below shows the approximate locations of the wind farm phases:
Articles and Resources
Additional data
To access additional data, including an interactive map of global wind farms, a downloadable dataset, and summary data, please visit the Global Wind Power Tracker on the Global Energy Monitor website.
References
- ↑ 1.00 1.01 1.02 1.03 1.04 1.05 1.06 1.07 1.08 1.09 1.10 1.11 1.12 1.13 1.14 1.15 1.16 1.17 1.18 1.19 1.20 1.21 https://web.archive.org/web/20240219010944/https://www.boe.es/diario_boe/txt.php?id=BOE-B-2023-14486. Archived from the original on 19 February 2024.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 2.0 2.1 2.2 2.3 2.4 2.5 2.6 2.7 2.8 (PDF) https://web.archive.org/web/20240219011331/https://www.boe.es/boe/dias/2022/12/23/pdfs/BOE-A-2022-22101.pdf. Archived from the original (PDF) on 19 February 2024.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 3.0 3.1 3.2 3.3 3.4 https://renewablesnow.com/news/forestalia-secures-enviro-permit-for-disputed-wind-mega-project-in-spain-808986/?utm_campaign=green-focus-europe-weekly&utm_edition=202212260800&utm_medium=email&utm_source=newsletter.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 4.0 4.1 4.2 4.3 4.4 https://paisajesteruel.org/cluster-maestrazgo-2/.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 5.0 5.1 (PDF) https://web.archive.org/web/20240219011656/https://www.boe.es/boe/dias/2023/06/03/pdfs/BOE-A-2023-13295.pdf. Archived from the original (PDF) on 19 February 2024.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 6.0 6.1 (PDF) https://web.archive.org/web/20240219011753/https://www.boe.es/boe/dias/2023/06/03/pdfs/BOE-A-2023-13304.pdf. Archived from the original (PDF) on 19 February 2024.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 7.0 7.1 (PDF) https://web.archive.org/web/20240219011731/https://www.boe.es/boe/dias/2023/06/03/pdfs/BOE-A-2023-13305.pdf. Archived from the original (PDF) on 19 February 2024.
{{cite web}}
: Missing or empty|title=
(help)