Cabeza Gorda wind farm

From Global Energy Monitor
This article is part of the
Global Wind Power Tracker, a Global Energy Monitor project.
Report an error

Cabeza Gorda wind farm (Parque eólico Cabeza Gorda) is a wind farm in pre-construction in Serradilla del Arroyo, Salamanca, Castilla y León, Spain.

Project Details

Table 1: Phase-level project details for Cabeza Gorda wind farm

Status Nameplate capacity Type Owner Operator
Pre-construction[1] 124 MW[2] Onshore[3] Siemens Gamesa Renewable Energy SA [100%] (Siemens Gamesa Renewable Energy A.E.)[4] Sistemas Energéticos Balazote[5]

Location

Table 2: Phase-level location details for Cabeza Gorda wind farm

Location Coordinates (WGS 84)
Serradilla del Arroyo, Salamanca, Castilla y León, Spain[3] 40.5214, -6.3599 (approximate)[3]

The map below shows the approximate location of the wind farm:

Loading map...

Articles and Resources

Additional data

To access additional data, including an interactive map of global wind farms, a downloadable dataset, and summary data, please visit the Global Wind Power Tracker on the Global Energy Monitor website.

References

  1. https://www.lagacetadesalamanca.es/provincia/el-gobierno-frena-una-inversion-eolica-de-105-millones-de-euros-en-serradilla-del-arroyo-PC12231295 https://www.boe.es/diario_boe/txt.php?id=BOE-A-2022-16010, https://www.lagacetadesalamanca.es/provincia/el-gobierno-frena-una-inversion-eolica-de-105-millones-de-euros-en-serradilla-del-arroyo-PC12231295. {{cite web}}: Check |url= value (help); Missing or empty |title= (help)
  2. https://www.salamanca24horas.com/provincia/ciudad-rodrigo/aprobada-declaracion-impacto-ambiental-construir-parque-eolico-en-serradilla-arroyo_15054940_102.html https://www.boe.es/diario_boe/txt.php?id=BOE-A-2022-16010, https://www.salamanca24horas.com/provincia/ciudad-rodrigo/aprobada-declaracion-impacto-ambiental-construir-parque-eolico-en-serradilla-arroyo_15054940_102.html. {{cite web}}: Check |url= value (help); Missing or empty |title= (help)
  3. 3.0 3.1 3.2 https://www.boe.es/diario_boe/txt.php?id=BOE-A-2022-16010 https://www.larazon.es/castilla-y-leon/20210425/dm22zfavevf4belbsuez7ptgpy.html, https://www.boe.es/diario_boe/txt.php?id=BOE-A-2022-16010. {{cite web}}: Check |url= value (help); Missing or empty |title= (help)
  4. "Castilla y León duplicará su potencia eólica hasta alcanzar los 13 GW con la instalación de más de cien nuevos grandes parques". La Razón. 2021-04-25. Archived from the original on 2024-01-26.
  5. "BOE-A-2022-16010 Resolución de 22 de septiembre de 2022, de la Dirección General de Calidad y Evaluación Ambiental, por la que se formula declaración de impacto ambiental del proyecto Parque Eólico "Cabeza gorda" de 124 MW". Boletín Oficial del Estado. 2022-10-01. Archived from the original on 2024-01-26.