Cabrillas wind farm

From Global Energy Monitor
This article is part of the
Global Wind Power Tracker, a Global Energy Monitor project.
Report an error

Other names: Las Cabrillas wind farm

Cabrillas wind farm (Parque eólico Las Cabrillas) is an operating wind farm in Castelló / Castellón, Valencian Community, Spain.

Project Details

Table 1: Phase-level project details for Cabrillas wind farm

Phase name Status Commissioning year Nameplate capacity Type Owner Operator
1 Operating[1] 2007[2] 29 MW[1] Onshore[1] Med Wind [50%]; Acciona Energía SAU [50%][2][3][2][3] Energias Renovables Mediterráneas SA[1]
2 Pre-construction[4][5] 13.8 MW[6][5] Onshore[6] Med Wind [50%]; Acciona Energía SAU [50%][2][3][5][2][3] Energias Renovables Mediterráneas SA[7]

Location

Table 2: Phase-level location details for Cabrillas wind farm

Phase Name Location Coordinates (WGS 84)
1 Castelló / Castellón, Valencian Community, Spain[8] 40.5327, -0.2625 (exact)[8]
2 Portell de Morella, Castellón, Valencia, Spain[4][5] 40.534803, -0.246552 (approximate)[4][5]

The map below shows the locations of the wind farm phases:

Loading map...

Articles and Resources

Additional data

To access additional data, including an interactive map of global wind farms, a downloadable dataset, and summary data, please visit the Global Wind Power Tracker on the Global Energy Monitor website.

References

  1. 1.0 1.1 1.2 1.3 https://web.archive.org/web/20240126043228/https://aeeolica.org/sobre-la-eolica/mapa-de-parques-eolicos/comunidad-valenciana/cabrillas/. Archived from the original on 26 January 2024. {{cite web}}: Missing or empty |title= (help)
  2. 2.0 2.1 2.2 2.3 2.4 (PDF) https://web.archive.org/web/20240126042122/https://procoazrbolsast01.blob.core.windows.net/media/gjmaeaw2/acciona-energ%C3%ADa-capital-markets-day-presentation.pdf. Archived from the original (PDF) on 26 January 2024. {{cite web}}: Missing or empty |title= (help)
  3. 3.0 3.1 3.2 3.3 https://web.archive.org/web/20240131145036/https://www.expansion.com/valencia/2016/08/18/57b5f34122601d822d8b45fd.html. Archived from the original on 31 January 2024. {{cite web}}: Missing or empty |title= (help)
  4. 4.0 4.1 4.2 https://web.archive.org/web/20240126144311/https://cindi.gva.es/documents/161328209/174067084/5+EIA+Las+Cabrillas-sintesis/fad594bd-882c-4adc-8b74-b6ff01420ace. Archived from the original on 26 January 2024. {{cite web}}: Missing or empty |title= (help)
  5. 5.0 5.1 5.2 5.3 5.4 https://bop.dipcas.es/PortalBOP/api/descargarAnuncio?idAnuncio=133145&idioma=es. {{cite web}}: Missing or empty |title= (help)
  6. 6.0 6.1 https://web.archive.org/web/20240126043234/https://cindi.gva.es/es/web/energia/castello/-/asset_publisher/3VvshcPfuBSo/content/portell-de-morella-parque-eolico-las-cabrillas-ii-solicitudes-de-autorizacion-de-implantacion-en-suelo-no-urbanizable-de-autorizacion-administrativa-p. Archived from the original on 26 January 2024. {{cite web}}: Missing or empty |title= (help)
  7. https://web.archive.org/web/20240126170419/https://www.elperiodicomediterraneo.com/castello/2020/07/21/nuevos-parques-eolicos-castellon-estaran-40771155.html. Archived from the original on 26 January 2024. {{cite web}}: Missing or empty |title= (help)
  8. 8.0 8.1 https://web.archive.org/web/20230103182122/https://datasets.wri.org/dataset/globalpowerplantdatabase. Archived from the original on 03 January 2023. {{cite web}}: Check date values in: |archive-date= (help); Missing or empty |title= (help)