Cambo Oil and Gas Field (United Kingdom)

From Global Energy Monitor
This article is part of the Global Oil and Gas Extraction Tracker, a Global Energy Monitor project.
Report an error
Related categories:

Cambo Oil and Gas Field is an in development oil and gas field in United Kingdom.

Cambo Oil and Gas Field is also sometimes referred to as Cambo Phase 1 Oil and Gas Field.

Project Details

Main Data

Table 1: Field-level project details for Cambo Oil and Gas Field

*Final Investment Decision
Unit name Status Operator Owner Discovery year FID* year Production start year
Cambo In development[1] Ithaca Energy[2][3] Ithaca Energy (70.0%); Shell (30.0%)[4] 2002[5] 2024 (expected)[6] 2025 (expected)[7]

Production and Reserves

Table 2: Reserves of Cambo Oil and Gas Field

million m³ = million cubic meters million bbl = million barrels of oil
Fuel Description Reserve Classification Quantity Units Data Year Source
gas Recoverable resources 1514.94 million m³ 2021 [8]
oil recoverable reserves 800 million bbl [not stated] [9]
oil Recoverable resources 170 million bbl 2023 [8][10]

Table 3: Production from Cambo Oil and Gas Field

million m³/y = million cubic meters per year million bbl/y = million barrels of oil per year
Category Fuel Description Quantity Units Data Year Source
production design capacity gas 310.07 million m³/y [not stated] [9]
production design capacity oil 18.61 million bbl/y [not stated] [9]
production design capacity oil 19.49 million bbl/y 2029 [11]
production design capacity gas 227.38 million m³/y 2029 [12]

Location

Table 4: field-level location details for Cambo Oil and Gas Field

Concession/Block Location Coordinates (WGS 84)
204/4a, 204/5a, 204/9a, 204/10a[13] Offshore, United Kingdom[14] 60.8091, -4.1211 (exact)[14]

The map below shows the exact location of the field:

Loading map...

Background

The field was discovered in 2002 by Hess Corporation and appraised by four appraisal wells in 2012. In March 2014, Austrian oil and gas group OMV acquired the licenses for the project from Hess and became the operator of Cambo. In January 2017, Siccar Point Energy acquired the assets from OMV group and drilled the fifth and final appraisal well 204/10a-5 in 2018[15]. Ithaca Energy acquired Siccar Point Energy in July of 2022 and serves as the field operator.[16] The project is owned by Ithaca Energy Limited (70%) and Shell plc (30%).[17][18] Ithaca Energy is a wholly owned subsidiary of Delek Group.[19] As of August 2022, Shell was intending to sell its 30% stake in the project.[20]

Field developers initially planned for FID in Q3 2020, but that was deferred due to Covid-19.[15] FID was then expected to be reached in 2021 with production starting in 2025.[21] However, in December 2021, after facing sustained criticism from environmental groups, Shell announced its decision to sell its 30% stake in the project, stating that the economic case for investment in the North Atlantic project was not strong enough,[22] and later that same month, Siccar Point Energy made the decision to pause the project.[23] In March 2022, the field was granted a two-year license extension, which gives the companies exclusive rights to explore the field.[24] In August 2022, Shell launched a sale process for its 30% stake.[25]

Opposition

The project has faced significant criticism from environmental groups. Cambo field’s EIA does not account for its Scope 3 emissions, which include transporting, processing, distributing and, most significantly, using the oil products.[17] As the COP26 climate summit was being hosted in Glasgow in November 2021, ongoing controversy surrounded the project’s development.[26] #StopCambo campaign gathered more than a hundred thousand signatures from the public and over 80 civil society organizations on an open letter calling on the government to stop the project.[27] Opposition to or concern over the project has also been expressed by dozens of MPs and the UK Labour Party, Green Party, Scottish Labour, Scottish Greens, and Scottish National Party.[27] Greenpeace is also considering taking legal action if the UK government approves the project.[28][29]

Articles and Resources

Additional data

To access additional data, including an interactive map of oil and gas extraction sites, a downloadable dataset, and summary data, please visit the Global Oil and Gas Extraction Tracker on the Global Energy Monitor website.

References

  1. , https://www.bbc.com/news/uk-scotland-scotland-business-60917159 , https://www.offshore-technology.com/news/shell-stake-cambo-uk/ , https://www.energy-pedia.com/news/united-kingdom/siccar-point-submits-application-for-consent-to-the-oga-for-the-cambo-field-development-183173 , https://www.gov.uk/government/publications/cambo-phase-1-field-development https://www.bbc.com/news/uk-scotland-59608521 , https://www.bbc.com/news/uk-scotland-scotland-business-60917159 , https://www.offshore-technology.com/news/shell-stake-cambo-uk/ , https://www.energy-pedia.com/news/united-kingdom/siccar-point-submits-application-for-consent-to-the-oga-for-the-cambo-field-development-183173 , https://www.gov.uk/government/publications/cambo-phase-1-field-development. {{cite web}}: Check |url= value (help); Missing or empty |title= (help)
  2. https://policy.friendsoftheearth.uk/insight/tip-iceberg-future-fossil-fuel-extraction https://www.nsenergybusiness.com/projects/cambo-field-development/, https://policy.friendsoftheearth.uk/insight/tip-iceberg-future-fossil-fuel-extraction. {{cite web}}: Check |url= value (help); Missing or empty |title= (help)
  3. https://www.offshore-mag.com/regional-reports/north-sea-europe/article/14298836/shell-agrees-to-transfer-stake-in-cambo-oil-project-to-ithaca. {{cite web}}: Missing or empty |title= (help)
  4. https://www.offshore-technology.com/marketdata/cambo-conventional-oil-field-uk/, https://www.ithacaenergy.com/our-operations/ithaca-operated-assets/cambo, https://www.ithacaenergy.com/media/press-releasesyear/2022/completion-acquisition-siccar-point-energy https://www.nsenergybusiness.com/projects/cambo-field-development/, https://www.offshore-technology.com/marketdata/cambo-conventional-oil-field-uk/, https://www.ithacaenergy.com/our-operations/ithaca-operated-assets/cambo, https://www.ithacaenergy.com/media/press-releasesyear/2022/completion-acquisition-siccar-point-energy. {{cite web}}: Check |url= value (help); Missing or empty |title= (help)
  5. https://www.youtube.com/watch?v=BEn29qVGRfg, https://doi.org/10.1144/M52 https://www.nsenergybusiness.com/projects/cambo-field-development/, https://www.youtube.com/watch?v=BEn29qVGRfg, https://doi.org/10.1144/M52. {{cite web}}: Check |url= value (help); Missing or empty |title= (help)
  6. https://web.archive.org/web/20230907224515/https://oilprice.com/Energy/Crude-Oil/Whats-Behind-The-Surge-In-Investment-In-North-Sea-Oil-And-Gas.html. Archived from the original on 07 September 2023. {{cite web}}: Check date values in: |archive-date= (help); Missing or empty |title= (help)
  7. https://app.powerbi.com/view?r=eyJrIjoiZjI0MTYzMmQtODRiYy00ZmIwLTgwZWUtM2E2NmUyNTIxZmI0IiwidCI6ImU2ODFjNTlkLTg2OGUtNDg4Ny04MGZhLWNlMzZmMWYyMWIwZiJ9, https://www.ithacaenergy.com/sites/ithaca/files/D-4261-2021-Cambo-ES.pdf, https://www.offshore-technology.com/marketdata/cambo-conventional-oil-field-uk/ https://www.offshore-mag.com/field-development/article/14205994/approval-sought-for-deepwater-cambo-oil-project-west-of-shetland, https://app.powerbi.com/view?r=eyJrIjoiZjI0MTYzMmQtODRiYy00ZmIwLTgwZWUtM2E2NmUyNTIxZmI0IiwidCI6ImU2ODFjNTlkLTg2OGUtNDg4Ny04MGZhLWNlMzZmMWYyMWIwZiJ9, https://www.ithacaenergy.com/sites/ithaca/files/D-4261-2021-Cambo-ES.pdf, https://www.offshore-technology.com/marketdata/cambo-conventional-oil-field-uk/. {{cite web}}: Check |url= value (help); Missing or empty |title= (help)
  8. 8.0 8.1 https://web.archive.org/web/20230509122908/https://www.bbc.com/news/uk-scotland-59608521. Archived from the original on 09 May 2023. {{cite web}}: Check date values in: |archive-date= (help); Missing or empty |title= (help)
  9. 9.0 9.1 9.2 https://web.archive.org/web/20221031123645/https://www.nsenergybusiness.com/projects/cambo-field-development/. Archived from the original on 31 October 2022. {{cite web}}: Missing or empty |title= (help)
  10. https://web.archive.org/web/20230330110505/https://www.energyvoice.com/oilandgas/north-sea/west-of-shetland/487069/north-sea-windfall-tax-could-hit-ithacas-cambo-fid-plans-according-to-reports/. Archived from the original on 30 March 2023. {{cite web}}: Missing or empty |title= (help)
  11. https://web.archive.org/web/20221006071139/https://www.offshore-technology.com/marketdata/cambo-conventional-oil-field-uk/. Archived from the original on 06 October 2022. {{cite web}}: Check date values in: |archive-date= (help); Missing or empty |title= (help)
  12. https://web.archive.org/web/20221001213415/https://www.offshore-technology.com/marketdata/cambo-conventional-oil-field-uk/. {{cite web}}: Missing or empty |title= (help)
  13. https://www.offshore-technology.com/projects/cambo-oil-field/, https://itportal.nstauthority.co.uk/information/licence_reports/offshorebyblock.html https://www.ithacaenergy.com/sites/ithaca/files/D-4261-2021-Cambo-ES.pdf, https://www.offshore-technology.com/projects/cambo-oil-field/, https://itportal.nstauthority.co.uk/information/licence_reports/offshorebyblock.html. {{cite web}}: Check |url= value (help); Missing or empty |title= (help)
  14. 14.0 14.1 (PDF) https://web.archive.org/web/20211122145551/https://assets.publishing.service.gov.uk/government/uploads/system/uploads/attachment_data/file/991817/D-4261-2021_-_ES.pdf. Archived from the original (PDF) on 22 November 2021. {{cite web}}: Missing or empty |title= (help)
  15. 15.0 15.1 Cite error: Invalid <ref> tag; no text was provided for refs named :2
  16. "Completion of Acquisition of Siccar Point Energy". Ithaca Energy. Retrieved 2022-08-30.
  17. 17.0 17.1 "Tip of the iceberg: The future of fossil fuel extraction | Policy and insight". Friends of the Earth | Policy and insight. Retrieved 2022-08-30.
  18. Cite error: Invalid <ref> tag; no text was provided for refs named :3
  19. "About Us". Ithaca Energy. Retrieved 2022-08-30.
  20. Cite error: Invalid <ref> tag; no text was provided for refs named :0
  21. Cite error: Invalid <ref> tag; no text was provided for refs named :1
  22. "Shell pulls out of Cambo oil field development". BBC News. Retrieved 2022-08-30.
  23. "Cambo oil field development off Shetland to be paused". BBC News. Retrieved 2022-08-30.
  24. "Cambo oil field off Shetland granted two-year licence extension". BBC News. Retrieved 2022-08-30.
  25. Ron Bousso. "Shell launches sale of North Sea Cambo oil prospect -sources". U.S. Retrieved 2022-08-30.
  26. "Is a new oil field climate change hypocrisy?". BBC News. Retrieved 2022-08-30.
  27. 27.0 27.1 "Who we are". Stop Cambo. Retrieved August 30, 2022.{{cite web}}: CS1 maint: url-status (link)
  28. "Cambo: Ithaca Energy pledges to develop controversial oil field". BBC News. Retrieved 2022-08-30.
  29. Andrew Dykes (2022-08-12). "'Buyer beware': Greenpeace vows Cambo legal action despite Shell exit". Energy Voice. Retrieved 2022-08-30.