Camp Springs Wind Energy Center
From Global Energy Monitor
This article is part of the Global Wind Power Tracker, a Global Energy Monitor project. |
Other names: Scurry County Wind II (Phase 2), Scurry County Wind LP (Phase 1)
Camp Springs Wind Energy Center is an operating wind farm in Scurry County, Texas, United States.
Project Details
Table 1: Phase-level project details for Camp Springs Wind Energy Center
Phase name | Status | Commissioning year | Nameplate capacity | Type | Owner | Operator |
---|---|---|---|---|---|---|
1 | Operating[1] | 2007[1] | 130 MW[2] | Onshore[2] | Invenergy LLC [100%][3] | Invenergy[4] |
2 | Operating[1] | 2007[1] | 120 MW[2] | Onshore[2] | Invenergy LLC [100%][5] | Invenergy[6] |
Location
Table 2: Phase-level location details for Camp Springs Wind Energy Center
Phase Name | Location | Coordinates (WGS 84) |
---|---|---|
1 | Scurry County, Texas, United States[2] | 32.7560, -100.8301 (exact)[2] |
2 | Scurry County, Texas, United States[2] | 32.8049, -100.9080 (exact)[2] |
The map below shows the exact locations of the wind farm phases:
Articles and Resources
Additional data
To access additional data, including an interactive map of global wind farms, a downloadable dataset, and summary data, please visit the Global Wind Power Tracker on the Global Energy Monitor website.
References
- ↑ 1.0 1.1 1.2 1.3 "U.S. Energy Information Administration, Form EIA-860 detailed data with previous form data (EIA-860A/860B), 2012". Archived from the original on 2022-10-28. Retrieved 2023-11-01 00:00:00.
{{cite web}}
: Check date values in:|access-date=
(help) - ↑ 2.0 2.1 2.2 2.3 2.4 2.5 2.6 2.7 Hoen, B.D., Diffendorfer, J.E., Rand, J.T., Kramer, L.A., Garrity, C.P., and Hunt, H.E. (2018-04-19). "US Wind Turbine Database (v4.0, (April 9, 2021): U.S. Geological Survey, American Clean Power Association, and Lawrence Berkeley National Laboratory data release". United States Wind Turbine Database. Archived from the original on 2021-12-03. Retrieved 2021-04-09.
{{cite web}}
: CS1 maint: multiple names: authors list (link) - ↑ https://web.archive.org/web/20240131092414/https://invenergy.com/news/invenergy-announces-the-commercial-operation-of-130-5-mw-camp-springs-wind-energy-center-in-texas. Archived from the original on 2024-01-31.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://web.archive.org/web/20240131004522/https://www.thewindpower.net/windfarm_en_3173.php. Archived from the original on 2024-01-31.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://web.archive.org/web/20240131092305/https://www.puc.texas.gov/industry/electric/directories/pgc/report_pgc.aspx?ID=PGSQL01DB1245458100157. Archived from the original on 2024-01-31.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://web.archive.org/web/20240131004524/https://www.thewindpower.net/windfarm_en_3156.php. Archived from the original on 2024-01-31.
{{cite web}}
: Missing or empty|title=
(help)