Campanario (Elawan) wind farm

From Global Energy Monitor
This article is part of the
Global Wind Power Tracker, a Global Energy Monitor project.
Report an error

Campanario (Elawan) wind farm (Parque eólico Campanario) is a wind farm in pre-construction in Montealegre del Castillo, Albacete, Castilla–La Mancha, Spain.

Project Details

Table 1: Phase-level project details for Campanario (Elawan) wind farm

Phase name Status Nameplate capacity Type Owner Operator
5 Pre-construction[1] 15 MW[2] Onshore[2] Elawan Energy SL [100%][3] Elawan Fotovoltaica Campanario 5[2]

Location

Table 2: Phase-level location details for Campanario (Elawan) wind farm

Phase Name Location Coordinates (WGS 84)
5 Montealegre del Castillo, Albacete, Castilla–La Mancha, Spain[2] 38.8038, -1.3602 (approximate)[2]

The map below shows the approximate location of the wind farm:

Loading map...

Related Projects

This project is related to the following project:


Articles and Resources

Additional data

To access additional data, including an interactive map of global wind farms, a downloadable dataset, and summary data, please visit the Global Wind Power Tracker on the Global Energy Monitor website.

References

  1. https://www.boe.es/diario_boe/txt.php?id=BOE-A-2024-4476 https://energiaestrategica.es/forestalia-de-nuevo-a-la-cabeza-mas-de-12-gw-renovables-avanzan-en-tramitacion-ambiental/, https://www.boe.es/diario_boe/txt.php?id=BOE-A-2024-4476. {{cite web}}: Check |url= value (help); Missing or empty |title= (help)
  2. 2.0 2.1 2.2 2.3 2.4 "BOE-A-2024-4476 Resolución de 26 de febrero de 2024, de la Dirección General de Calidad y Evaluación Ambiental, por la que se formula informe de determinación de afección ambiental del proyecto "Parque eólico Campanario V híbrido, de 15 MW, para su hibridación con el parque solar fotovoltaico FV Campanario V, de 48,13 MW, en la provincia de Albacete"". Boletín Oficial del Estado. 2024-03-07. Archived from the original on 2024-04-09. Retrieved 2024-04-04.
  3. "Forestalia de nuevo a la cabeza: Más de 1,2 GW renovables avanzan en tramitación ambiental". Energía Estratégica España. 2024-03-08. Archived from the original on 2024-04-13. Retrieved 2024-04-03.