Campo Arañuelo solar farm

From Global Energy Monitor
This article is part of the
Global Solar Power Tracker, a Global Energy Monitor project.
Report an error

Other names: Arañuelo I, Arañuelo II, Arañuelo III

Campo Arañuelo solar farm is an operating solar photovoltaic (PV) farm in Almaraz, Cáceres, Spain.

Project Details

Table 1: Phase-level project details for Campo Arañuelo solar farm

Phase name Status Commissioning year Nameplate capacity Technology Owner Operator
1 Operating[1] 2021[1] 50 MWp/dc[2] PV[2] Iberdrola SA[1] Iberdrola Renovables Energia SA[1]
2 Operating[1] 2021[1] 50 MWp/dc[2] PV[2] Iberdrola SA[1] Iberdrola Renovables Energia SA[1]
3 Operating[3] 2021[3] 40 MWp/dc[4] PV[4] Iberdrola SA[4] Iberdrola Renovables Energia SA[4]

Read more about Solar capacity ratings.

Location

Table 2: Phase-level location details for Campo Arañuelo solar farm

Phase Name Location Coordinates (WGS 84)
1 Almaraz, Cáceres, Spain[2] 39.8161, -5.6831 (approximate)[2]
2 Almaraz, Cáceres, Spain[2] 39.8161, -5.6831 (approximate)[2]
3 Romangordo, Cáceres, Spain[4] 39.7865, -5.7008 (exact)[5]

The map below shows the locations of the solar farm phases:

Loading map...

Articles and Resources

Additional data

To access additional data, including an interactive map of global solar farms, a downloadable dataset, and summary data, please visit the Global Solar Power Tracker on the Global Energy Monitor website.

References

  1. 1.0 1.1 1.2 1.3 1.4 1.5 1.6 1.7 https://www.iberdrola.com/press-room/news/detail/iberdrola-commissions-clevlavin-solar-plant-reaches-1-000-operational-photovoltaic-capacity-spain. {{cite web}}: Missing or empty |title= (help)
  2. 2.0 2.1 2.2 2.3 2.4 2.5 2.6 2.7 https://www.blog.iberdrola.com/2021/03/22/aranuelo-la-planta-solar-extremena-mas-innovadora-de-europa/. {{cite web}}: Missing or empty |title= (help)
  3. 3.0 3.1 https://www.iberdrola.com/press-room/news/detail/aranuelo-iii-first-photovoltaic-plant-spain-storage-battery. {{cite web}}: Missing or empty |title= (help)
  4. 4.0 4.1 4.2 4.3 4.4 https://www.iberdrola.com/press-room/news/detail/iberdrola-installs-first-battery-renewable-project-spain-aranuelo-photovoltaic-plant. {{cite web}}: Missing or empty |title= (help)
  5. https://goo.gl/maps/AmpVJb9e6hP2w4v79. {{cite web}}: Missing or empty |title= (help)