Cape Station geothermal power plant is a geothermal power plant in pre-construction in Beaver County, Utah, United States.
Project Details
Table 1: Unit-level project details for Cape Station geothermal power plant
Unit name | Status | Commissioning year | Nameplate capacity | Technology | Owner | Operator |
---|---|---|---|---|---|---|
1 | Construction[1] | 2026 (planned)[1] | 100 MW[2] | Enhanced geothermal systems (egs)[2] | Fervo Energy[1] | Fervo Energy[1] |
2 | Pre-construction[1] | 2028 (planned)[1] | 300 MW[2] | Enhanced geothermal systems (egs)[2] | Fervo Energy[1] | Fervo Energy[1] |
future units | Announced[3][1] | – | 1600 MW[3] | Enhanced geothermal systems (egs)[1] | Fervo Energy[1] | Fervo Energy[1] |
Location
Table 2: Unit-level location details for Cape Station geothermal power plant
Unit name | Location | Coordinates (WGS 84) |
---|---|---|
1 | Beaver County, Utah, United States[1] | 38.4693866, -112.9276109 (approximate)[1] |
2 | Beaver County, Utah, United States[1] | 38.4693866, -112.9276109 (approximate)[1] |
future units | Beaver County, Utah, United States[1] | 38.4693866, -112.9276109 (approximate)[1] |
The map below shows the approximate locations of the geothermal power plant units:
Articles and Resources
Additional data
To access additional data, including an interactive map of global geothermal power plants, a downloadable dataset, and summary data, please visit the Global Geothermal Power Tracker on the Global Energy Monitor website.
References
- ↑ 1.00 1.01 1.02 1.03 1.04 1.05 1.06 1.07 1.08 1.09 1.10 1.11 1.12 1.13 1.14 1.15 1.16 1.17 "Home - Cape Station". capestation.com. 2023-05-10. Archived from the original on 2024-04-09. Retrieved 2024-04-01.
- ↑ 2.0 2.1 2.2 2.3 "Fervo Energy breaks ground on next-gen geothermal project in Cape Station, Utah". 2023-09-26. Archived from the original on 2024-04-11. Retrieved 2024-04-01.
- ↑ 3.0 3.1 https://www.blm.gov/press-release/biden-harris-administration-takes-major-steps-accelerate-clean-energy-geothermal.
{{cite web}}
: Missing or empty|title=
(help)