Caraga Wind Power Project
From Global Energy Monitor
This article is part of the Global Wind Power Tracker, a Global Energy Monitor project. |
Other names: Caraga Wind Power Project Phase 1 (Phase 1), Caraga Wind Power Project Phase 2 (Phase 2), Caraga Wind Power Project Phase 3 (Phase 3)
Caraga Wind Power Project is a wind farm in pre-construction in Surigao City, Surigao del Norte Province, Philippines.
Project Details
Table 1: Phase-level project details for Caraga Wind Power Project
Phase name | Status | Commissioning year | Nameplate capacity | Type |
---|---|---|---|---|
1 | Pre-construction[1] | 2026 (planned)[2] | 36 MW[3] | Onshore[3] |
2 | Shelved (inferred July 2023) | – | 57 MW[4] | Onshore[2] |
3 | Shelved (inferred July 2023) | – | 57 MW[4] | Onshore[4] |
Location
Table 2: Phase-level location details for Caraga Wind Power Project
Phase Name | Location | Coordinates (WGS 84) |
---|---|---|
1 | Surigao City, Surigao del Norte Province, Philippines[2] | 9.7219, 125.4856 (approximate)[2] |
2 | Surigao City, Surigao del Norte Province, Philippines[4][2] | 9.7219, 125.4856 (approximate)[4][2] |
3 | Caraga Region, Philippines[4][2] | 9.7219, 125.4856 (approximate)[4][2] |
The map below shows the approximate locations of the wind farm phases:
Articles and Resources
Additional data
To access additional data, including an interactive map of global wind farms, a downloadable dataset, and summary data, please visit the Global Wind Power Tracker on the Global Energy Monitor website.
References
- ↑ (PDF) https://web.archive.org/web/20230126184348/https://www.doe.gov.ph/sites/default/files/pdf/electric_power/annex-a_coe-to-ngcp-clearance-to-undertake-sis-december-2022.pdf. Archived from the original (PDF) on 26 January 2023.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 2.0 2.1 2.2 2.3 2.4 2.5 2.6 2.7 (PDF) https://web.archive.org/web/20240125191519/https://www.doe.gov.ph/sites/default/files/pdf/electric_power/luzon_indicative_2022-mar-31-updated-05172022.pdf?withshield=1. Archived from the original (PDF) on 25 January 2024.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 3.0 3.1 (PDF) https://web.archive.org/web/20221224051454/http://www.doe.gov.ph/sites/default/files/pdf/electric_power/mindanao_indicative_2022-mar-31.pdf. Archived from the original (PDF) on 24 December 2022.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 4.0 4.1 4.2 4.3 4.4 4.5 4.6 https://web.archive.org/web/20240125192015/https://www.chodai.co.jp/en/news/2020/05/014234.html. Archived from the original on 25 January 2024.
{{cite web}}
: Missing or empty|title=
(help)