Carreto Solar Park

From Global Energy Monitor
This article is part of the
Global Solar Power Tracker, a Global Energy Monitor project.
Report an error

Carreto Solar Park (Parque Solar Carreto) is a solar photovoltaic (PV) farm in pre-construction in Magdalena, Colombia.

Project Details

Table 1: Phase-level project details for Carreto Solar Park

Status Commissioning year Nameplate capacity Technology Operator
Pre-construction[1] 2027 (planned)[2] 250 MW[1] PV[3] Solano[1]

Read more about Solar capacity ratings.

Location

Table 2: Phase-level location details for Carreto Solar Park

Location Coordinates (WGS 84)
Magdalena, Colombia[1] 5.4445, -74.7614 (approximate)[1]

The map below shows the approximate location of the solar farm:

Loading map...

Articles and Resources

Additional data

To access additional data, including an interactive map of global solar farms, a downloadable dataset, and summary data, please visit the Global Solar Power Tracker on the Global Energy Monitor website.

References

  1. 1.0 1.1 1.2 1.3 1.4 https://web.archive.org/web/20240125171503/https://www1.upme.gov.co/Normatividad/Anexo_articulo_50_R_CREG_075_2021_Circ_030.xlsx. Archived from the original on 2024-01-25. {{cite web}}: Missing or empty |title= (help)
  2. https://www.power-technology.com/marketdata/power-plant-profile-carreto-solar-pv-plant-colombia/. {{cite web}}: Missing or empty |title= (help)
  3. https://web.archive.org/web/20240207120935/https://www.keyfactsenergy.com/news/17933/view/. Archived from the original on 2024-02-07. {{cite web}}: Missing or empty |title= (help)