Carrington power station
Part of the Global Oil and Gas Plant Tracker, a Global Energy Monitor project. |
Related categories: |
Carrington power station is an operating power station of at least 950-megawatts (MW) in Carrington, Lancashire, United Kingdom.
Location
Table 1: Project-level location details
Plant name | Location | Coordinates (WGS 84) |
---|---|---|
Carrington power station | Carrington, Lancashire, United Kingdom | 53.43772, -2.41014 (exact)[1] |
The map below shows the exact location of the power station.
Unit-level coordinates (WGS 84):
- 1, 2, IC: 53.43772, -2.41014
Project Details
Table 2: Unit-level details
Unit name | Status | Fuel(s) | Capacity (MW) | Technology | CHP | Start year |
---|---|---|---|---|---|---|
1 | Operating[2] | fossil gas: natural gas[3] | 455[4][2] | combined cycle[3] | no | 2016[3] |
2 | Operating[2] | fossil gas: natural gas[3] | 455[4][2] | combined cycle[3] | no | 2016[3] |
IC | Operating[5][6][7] | fossil gas: natural gas[6] | 40.5[6] | ICCC[6] | yes[6] | 2024[6] |
CHP is an abbreviation for Combined Heat and Power. It is a technology that produces electricity and thermal energy at high efficiencies. Coal units track this information in the Captive Use section when known.
Table 3: Unit-level ownership and operator details
Unit name | Owner | Parent |
---|---|---|
1 | Electricity Supply Board [100%][8][3][9] | Government of Ireland [96.9%]; unknown [3.1%] |
2 | Electricity Supply Board [100%][8][3][9] | Government of Ireland [96.9%]; unknown [3.1%] |
IC | Carrington Generation Ltd [100%][10] | Tiger Infrastructure Associates GP III LP |
Background
In 2021 the project applied for 910 MW existing generation (units 1 and 2) in the T-4 Capacity Market 2024-2025 auction, and they were listed in the final results.[11][12] This would qualify them for government subsidies to guarantee electricity supply.[13]
Articles and Resources
References
- ↑ https://web.archive.org/web/20230103182122/https://datasets.wri.org/dataset/globalpowerplantdatabase. Archived from the original on 2023-01-03.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 2.0 2.1 2.2 2.3 https://web.archive.org/web/20220904165602/https://www.emrdeliverybody.com/Capacity%20Markets%20Document%20Library/Capacity%20Market%20Register%202024-25%20(T-4)%20-%2013_04_2021.xlsx. Archived from the original on 2022-09-04.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 3.0 3.1 3.2 3.3 3.4 3.5 3.6 3.7 https://web.archive.org/web/20221108073105/https://www.gov.uk/government/collections/digest-of-uk-energy-statistics-dukes. Archived from the original on 2022-11-08.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 4.0 4.1 https://web.archive.org/web/20221107230119/https://transparency.entsoe.eu/. Archived from the original on 2022-11-07.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://web.archive.org/web/20240126062700/https://www.nationalgrideso.com/document/183631/download. Archived from the original on 2024-01-26.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 6.0 6.1 6.2 6.3 6.4 6.5 (PDF) https://web.archive.org/web/20220520031529/https://consult.environment-agency.gov.uk/psc/m31-4rq-carrington-generation-limited/supporting_documents/NonTechnical%20Summary.pdf. Archived from the original (PDF) on 2022-05-20.
{{cite web}}
: Missing or empty|title=
(help) - ↑ "Carrington Generation Fully Operational!". Forsa Energy - Leaders in the Energy Evolution. Archived from the original on 2024-12-04. Retrieved 2024-10-28.
- ↑ 8.0 8.1 https://web.archive.org/web/20230108191432/https://www.gov.uk/government/statistics/electricity-chapter-5-digest-of-united-kingdom-energy-statistics-dukes. Archived from the original on 2023-01-08.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 9.0 9.1 (PDF) https://web.archive.org/web/20221219100409/https://esb.ie/docs/default-source/education-hub/carrington-power-station.pdf. Archived from the original (PDF) on 2022-12-19.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://www.gov.uk/government/publications/m31-4rq-carrington-generation-limited-environmental-permit-application-advertisement-eprbp3544qda001/m31-4rq-carrington-generation-limited-environmental-permit-application-advertisement-eprbp3544qda001.
{{cite web}}
: Missing or empty|title=
(help) - ↑ T4 DY2024-25 Final Results, Electricity Market Reform Delivery Body, Mar 22, 2021
- ↑ Capacity Market Register 2024-25 (T-4) - 13_04_2021, Electricity Market Reform Delivery Body, Apr 13, 2021
- ↑ Capacity Market, United Kingdom, Mar 1, 2019
Additional data
To access additional data, including an interactive map of gas-fired power stations, a downloadable dataset, and summary data, please visit the Global Oil and Gas Plant Tracker on the Global Energy Monitor website.