Casa Nova wind farm (Complexo Eólico Casa Nova) is an operating wind farm in Casa Nova, Região Administrativa Integrada de Desenvolvimento do Polo Petrolina e Juazeiro, Região Geográfica Intermediária de Juazeiro, Bahia, Brazil.

Project Details

Table 1: Phase-level project details for Casa Nova wind farm

Phase name Status Commissioning year Nameplate capacity Type Owner Operator
2 Operating[1] 2017[1] 33 MW[1] Onshore[1] Companhia Hidro Elétrica do São Francisco SA (CHESF) [100%][2][3] Companhia Hidro Elétrica do São Francisco SA (CHESF)[3]
3 Operating[1] 2018[1] 28 MW[1] Onshore[1] Companhia Hidro Elétrica do São Francisco SA (CHESF) [100%][2][3] Companhia Hidro Elétrica do São Francisco SA (CHESF)[3]
A Operating[1] 2020[1] 27 MW[1] Onshore[1] Companhia Hidro Elétrica do São Francisco SA (CHESF) [100%][4][5] Companhia Hidro Elétrica do São Francisco SA (CHESF)[5]
B Construction[1] 27 MW[6] Onshore[6] Companhia Hidro Elétrica do São Francisco SA (CHESF) [100%][7][4] Companhia Hidro Elétrica do São Francisco SA (CHESF)[7][4]
C Shelved (inferred August 2023) 26 MW[6] Onshore[6] Companhia Hidro Elétrica do São Francisco SA (CHESF) [100%][7] Companhia Hidro Elétrica do São Francisco SA (CHESF)[7]
D Pre-construction[1] 22 MW[6] Onshore[6] Companhia Hidro Elétrica do São Francisco SA (CHESF) [100%][7] Companhia Hidro Elétrica do São Francisco SA (CHESF)[7]
E Pre-construction[1] 27 MW[6] Onshore[6] Companhia Hidro Elétrica do São Francisco SA (CHESF) [100%][7] Companhia Hidro Elétrica do São Francisco SA (CHESF)[7]
F Pre-construction[1] 24 MW[6] Onshore[6] Companhia Hidro Elétrica do São Francisco SA (CHESF) [100%][7] Companhia Hidro Elétrica do São Francisco SA (CHESF)[7]
G Pre-construction[1] 27 MW[6] Onshore[6] Companhia Hidro Elétrica do São Francisco SA (CHESF) [100%][7] Companhia Hidro Elétrica do São Francisco SA (CHESF)[7]

Location

Table 2: Phase-level location details for Casa Nova wind farm

Phase Name Location Coordinates (WGS 84)
2 Casa Nova, Região Administrativa Integrada de Desenvolvimento do Polo Petrolina e Juazeiro, Região Geográfica Intermediária de Juazeiro, Bahia, Brazil[1] -9.2706, -41.0501 (exact)[1]
3 Casa Nova, Região Administrativa Integrada de Desenvolvimento do Polo Petrolina e Juazeiro, Região Geográfica Intermediária de Juazeiro, Bahia, Brazil[1] -9.3148, -41.1175 (exact)[1]
A Casa Nova, Região Administrativa Integrada de Desenvolvimento do Polo Petrolina e Juazeiro, Região Geográfica Intermediária de Juazeiro, Bahia, Brazil[1] -9.2602, -41.0168 (exact)[1]
B Casa Nova, Bahia, Brazil[1] -9.2602, -41.0168 (approximate)[1]
C Casa Nova, Bahia, Brazil[1] -9.2602, -41.0168 (approximate)[1]
D Casa Nova, Bahia, Brazil[1] -9.2602, -41.0168 (approximate)[1]
E Casa Nova, Bahia, Brazil[1] -9.2602, -41.0168 (approximate)[1]
F Casa Nova, Bahia, Brazil[1] -9.2602, -41.0168 (approximate)[1]
G Casa Nova, Bahia, Brazil[1] -9.2602, -41.0168 (approximate)[1]

The map below shows the locations of the wind farm phases:

Loading map...

Articles and Resources

Additional data

To access additional data, including an interactive map of global wind farms, a downloadable dataset, and summary data, please visit the Global Wind Power Tracker on the Global Energy Monitor website.

References

  1. 1.00 1.01 1.02 1.03 1.04 1.05 1.06 1.07 1.08 1.09 1.10 1.11 1.12 1.13 1.14 1.15 1.16 1.17 1.18 1.19 1.20 1.21 1.22 1.23 1.24 1.25 1.26 1.27 1.28 1.29 1.30 1.31 1.32 1.33 1.34 https://web.archive.org/web/20220309212208/https://www.aneel.gov.br/siga. Archived from the original on 09 March 2022. {{cite web}}: Check date values in: |archive-date= (help); Missing or empty |title= (help)
  2. 2.0 2.1 https://web.archive.org/web/20211008024752/https://www.chesf.gov.br/_layouts/15/chesf_noticias_farm/noticia.aspx?idnoticia=234. Archived from the original on 08 October 2021. {{cite web}}: Check date values in: |archive-date= (help); Missing or empty |title= (help)
  3. 3.0 3.1 3.2 3.3 https://web.archive.org/web/20211015075134/https://www.youtube.com/watch?v=Tega-sV6FXQ&gl=US&hl=en. Archived from the original on 15 October 2021. {{cite web}}: Missing or empty |title= (help)
  4. 4.0 4.1 4.2 https://web.archive.org/web/20211008030851/https://www.chesf.gov.br/_layouts/15/Chesf_Noticias_Farm/Noticia.aspx?IDNoticia=635. Archived from the original on 08 October 2021. {{cite web}}: Check date values in: |archive-date= (help); Missing or empty |title= (help)
  5. 5.0 5.1 https://web.archive.org/web/20240130223132/https://badevalor.com.br/chesf-conclui-energizacao-do-complexo-eolico-casa-nova-i/. Archived from the original on 30 January 2024. {{cite web}}: Missing or empty |title= (help)
  6. 6.00 6.01 6.02 6.03 6.04 6.05 6.06 6.07 6.08 6.09 6.10 6.11 https://www.camara.leg.br/proposicoesWeb/prop_mostrarintegrajsessionid=60A3934EAFC1C6827C0D6CA55102BAAD.proposicoesWebExterno1?codteor=1762201&filename=Tramitacao-RIC+476/2019. {{cite web}}: Missing or empty |title= (help)
  7. 7.00 7.01 7.02 7.03 7.04 7.05 7.06 7.07 7.08 7.09 7.10 7.11 (PDF) https://web.archive.org/web/20210303114526/https://chesf.gov.br/relainvest/Documents/Comunicado%20ao%20Mercado%20Chesf%20-%20Resposta%20Of%C3%ADcio%20CVM%20-%20Casa%20Nova%20I.pdf. Archived from the original (PDF) on 03 March 2021. {{cite web}}: Check date values in: |archive-date= (help); Missing or empty |title= (help)