Casino to Iona Pipeline
From Global Energy Monitor
This article is part of the Global Fossil Infrastructure Tracker, a project of Global Energy Monitor. |
Sub-articles: |
The Casino to Iona Pipeline is an operating natural gas pipeline.[1]
Location
The pipeline runs from the Casino Gas Field in the Otway Basin, offshore Victoria, to the Iona gas processing plant in Port Campbell, Victoria.
Project details
- Operator: Santos
- Parent company: Santos 50%; AWE 25%; Mitsui 25%[1]
- Capacity: 103.31 million cubic feet per day / 109 terajoules per day[1]
- Length: 46 kilometers[1]
- Status: Operating
- Start Year: 2006
Background
The pipeline is operated by Santos and owned by Santos (50%), AWE (25%), and Mitsui (25%).[1]