Castelnou-Villar de Arnedo-Haro Gas Pipeline
From Global Energy Monitor
This article is part of the Global Fossil Infrastructure Tracker, a project of Global Energy Monitor. |
Sub-articles: |
Castelnou-Villar de Arnedo-Haro Gas Pipeline is an operating natural gas pipeline in Spain.[1]
Location
The pipeline runs through from Castelnou, through Villar de Arnedo to Haro, Spain.
Project Details
- Operator: Enagás, S.A.
- Owner: Enagás, S.A.[2]
- Parent Company: Enagás, S.A.[3]
- Current Capacity:
- Length: 278 km.[4]
- Diameter: 30, 26 inches
- Status: Operating
- Start Year: 1979-2005.[5]
Articles and resources
References
- ↑ Transmission, storage and regasification services and infrastructure, Enagás, accessed December 2019.
- ↑ "The Spanish Gas System" (PDF). Enagas. 2021. Retrieved Aug 8th, 2022.
{{cite web}}
: Check date values in:|access-date=
(help)CS1 maint: url-status (link) - ↑ Enagás. "Gas Pipelines - Energy Infrastructure - Enagás". www.enagas.es. Retrieved 2022-08-08.
- ↑ About us, Enagás, accessed December 2019.
- ↑ Pipeline projects list: Europe: Spain, SIMDEX, accessed December 2019.