Cayanga-Bugallon II Solar Power Project

From Global Energy Monitor
This article is part of the
Global Solar Power Tracker, a Global Energy Monitor project.
Report an error

Other names: Cayanga-Bugallon Solar Power Project

Cayanga-Bugallon II Solar Power Project is a solar photovoltaic (PV) farm in pre-construction in Bugallon, Pangasinan Province, Philippines.

Project Details

Table 1: Phase-level project details for Cayanga-Bugallon II Solar Power Project

Status Commissioning year Nameplate capacity Technology Owner
Pre-construction[1] 2023 (planned)[1] 75 MW[1] PV[1] PV Sinag Power INC [100%][2]

Read more about Solar capacity ratings.

Location

Table 2: Phase-level location details for Cayanga-Bugallon II Solar Power Project

Location Coordinates (WGS 84)
Bugallon, Pangasinan Province, Philippines[1] 15.9016, 120.1614 (approximate)[1]

The map below shows the approximate location of the solar farm:

Loading map...

Articles and Resources

Additional data

To access additional data, including an interactive map of global solar farms, a downloadable dataset, and summary data, please visit the Global Solar Power Tracker on the Global Energy Monitor website.

References

  1. 1.0 1.1 1.2 1.3 1.4 1.5 (PDF) https://web.archive.org/web/20240201134811/https://www.doe.gov.ph/sites/default/files/pdf/electric_power/01-luzon_committed_lopsipp_30-november-2022.pdf. Archived from the original (PDF) on 01 February 2024. {{cite web}}: Check date values in: |archive-date= (help); Missing or empty |title= (help)
  2. https://web.archive.org/web/20240206191224/https://www.power-technology.com/marketdata/power-plant-profile-cayanga-bugallon-solar-power-project-philippines/. Archived from the original on 06 February 2024. {{cite web}}: Check date values in: |archive-date= (help); Missing or empty |title= (help)