Cedar Springs wind farm

From Global Energy Monitor
This article is part of the
Global Wind Power Tracker, a Global Energy Monitor project.
Report an error

Cedar Springs wind farm is an operating wind farm in Converse County, Wyoming, United States.

Project Details

Table 1: Phase-level project details for Cedar Springs wind farm

Phase name Status Commissioning year Nameplate capacity Type Owner Operator
1 Operating[1] 2020[2] 199 MW[2] Onshore[2] NextEra Energy Inc [100%][3] NextEra Energy[3]
2 Operating[1] 2020[2] 202 MW[2] Onshore[2] PacifiCorp [100%][3] PacifiCorp[3]
3 Operating[1] 2020[2] 133 MW[2] Onshore[2] NextEra Energy Inc [100%][3] NextEra Energy[3]
4 Construction[4] 390.4 MW[5] Onshore[5] NextEra Energy Inc[6]

Location

Table 2: Phase-level location details for Cedar Springs wind farm

Phase Name Location Coordinates (WGS 84)
1 Converse County, Wyoming, United States[2] 43.1283, -105.4620 (exact)[2]
2 Converse County, Wyoming, United States[7] 42.9036, -105.3203 (exact)[7]
3 Converse County, Wyoming, United States[2] 43.0693, -105.5701 (exact)[2]
4 Converse County, Wyoming, United States[5] 43.1008, -105.7115 (exact)[5]

The map below shows the exact locations of the wind farm phases:

Loading map...

Articles and Resources

Additional data

To access additional data, including an interactive map of global wind farms, a downloadable dataset, and summary data, please visit the Global Wind Power Tracker on the Global Energy Monitor website.

References

  1. 1.0 1.1 1.2 "U.S. Energy Information Administration, Form EIA-860 detailed data with previous form data (EIA-860A/860B), 2012". Archived from the original on 2022-10-28. Retrieved 2023-11-01 00:00:00. {{cite web}}: Check date values in: |access-date= (help)
  2. 2.00 2.01 2.02 2.03 2.04 2.05 2.06 2.07 2.08 2.09 2.10 2.11 2.12 Hoen, B.D., Diffendorfer, J.E., Rand, J.T., Kramer, L.A., Garrity, C.P., and Hunt, H.E. (2018-04-19). "US Wind Turbine Database (v4.0, (April 9, 2021): U.S. Geological Survey, American Clean Power Association, and Lawrence Berkeley National Laboratory data release". United States Wind Turbine Database. Archived from the original on 2021-12-03. Retrieved 2021-04-09.{{cite web}}: CS1 maint: multiple names: authors list (link)
  3. 3.0 3.1 3.2 3.3 3.4 3.5 https://web.archive.org/web/20240131005122/https://cowboystatedaily.com/2020/12/16/192-new-wind-turbines-fully-operational-in-converse-county/. Archived from the original on 2024-01-31. {{cite web}}: Missing or empty |title= (help)
  4. https://www.eia.gov/electricity/data/eia860m/xls/november_generator2024.xlsx https://www.eia.gov/electricity/data/eia860m/, https://www.eia.gov/electricity/data/eia860m/xls/november_generator2024.xlsx. {{cite web}}: Check |url= value (help); Missing or empty |title= (help)
  5. 5.0 5.1 5.2 5.3 "Preliminary Monthly Electric Generator Inventory (based on Form EIA-860M as a supplement to Form EIA-860) - U.S. Energy Information Administration (EIA)". www.eia.gov. Archived from the original on 2023-05-09. Retrieved 2025-01-06.
  6. https://www.newsdata.com/clearing_up/briefs/cedar-springs-wind-farm-in-wyoming-to-add-up-to-393-mw/article_8e414a34-e064-11ed-bf11-9b1d1673d7c8.html. {{cite web}}: Missing or empty |title= (help)
  7. 7.0 7.1 https://web.archive.org/web/20240125152732/https://www.fakeaddress.com/. Archived from the original on 2024-01-25. {{cite web}}: Missing or empty |title= (help)