Celikler Sultanhisar 2 geothermal power plant
From Global Energy Monitor
This article is part of the Global Geothermal Power Tracker, a Global Energy Monitor project. |
Celikler Sultanhisar 2 geothermal power plant is an operating geothermal power plant in Sultanhisar, Aydın, Türkiye.
Project Details
Table 1: Unit-level project details for Celikler Sultanhisar 2 geothermal power plant
Status | Commissioning year | Nameplate capacity | Technology | Owner |
---|---|---|---|---|
Operating[1] | 2018[1] | 23 MW[1] | Binary cycle[2] | Celikler Holding [100%][1] |
Location
Table 2: Unit-level location details for Celikler Sultanhisar 2 geothermal power plant
Location | Coordinates (WGS 84) |
---|---|
Sultanhisar, Aydın, Türkiye | 37.8962, 28.1731 (exact) |
The map below shows the exact location of the geothermal power plant:
Articles and Resources
Additional data
To access additional data, including an interactive map of global geothermal power plants, a downloadable dataset, and summary data, please visit the Global Geothermal Power Tracker on the Global Energy Monitor website.
References
- ↑ 1.0 1.1 1.2 1.3 https://web.archive.org/web/20220418162700/https://www.ormat.com/en/projects/all/main/?Country=Turkey&Seg=0&Tech=6&pageNum=2. Archived from the original on 18 April 2022.
{{cite web}}
: Missing or empty|title=
(help) - ↑ (PDF) https://web.archive.org/web/20220706092037/https://www.geothermal-energy.org/pdf/IGAstandard/WGC/2020/01049.pdf. Archived from the original (PDF) on 06 July 2022.
{{cite web}}
: Check date values in:|archive-date=
(help); Missing or empty|title=
(help)