Cemindo Gemilang power station is an operating power station of at least 60-megawatts (MW) in Labak, Banten, Indonesia.

Location

Table 1: Project-level location details

Plant name Location Coordinates (WGS 84)
Cemindo Gemilang power station Labak, Banten, Indonesia -6.950808, 106.250158 (exact)

The map below shows the exact location of the power station.

Loading map...


Unit-level coordinates (WGS 84):

  • ': -6.950808, 106.250158

Project Details

Table 2: Unit-level details

Status Fuel(s) Capacity (MW) Technology Start year
operating coal: unknown 60 unknown 2016

Table 3: Unit-level ownership and operator details

Owner Parent
PT Cemindo Gemilang Tbk [100%] PT Cemindo Gemilang Tbk [100.0%]

Project-level captive use details

  • Captive industry use (heat or power): power
  • Captive industry: Cement & Building


Background

The plant was completed in July 2016 at a cost of US$150 million. It powers the PT Cemindo Gemilang cement factory in Labak regency.[1]