Central Hebei Ten Counties Gas Pipeline Network (Phase 4)

From Global Energy Monitor
This article is part of the Global Fossil Infrastructure Tracker, a project of Global Energy Monitor.
Sub-articles:

Central Hebei Ten Counties Gas Pipeline Network (Phase 4) 冀中十县管网工程(四期) is a construction gas pipeline in Hebei province, China.[1]

Location

The trunk line of the pipeline runs from Raoyang County, Hengshui, to Hejian City, Cangzhou.[2]

Project details

  • Operator:
  • Owner: Hebei NATURAL Gas Company Limited[3]
  • Parent company:
  • Capacity: 0.492 bcm/y[2]
  • Length: 100.7 km (100.5 km of the trunk line and 0.2 km of the connection line)[2]
  • Diameter: 500 mm (the trunk line); 250 mm (the connection line)[2]
  • Status: Construction[1]
  • Start year:
  • Cost: 365.2576 million RMB[3]
  • Financing:
  • Associated infrastructure: Central Hebei Ten Counties Gas Pipeline Network (Phase 1); Ordos-Anping-Cangzhou Gas Pipeline[2]

Background

The pipeline will have two new stations, one renovated station, and two line cut-off valve rooms.[2]