Central Queensland Power Project wind farm

From Global Energy Monitor
This article is part of the
Global Wind Power Tracker, a Global Energy Monitor project.
Report an error

Central Queensland Power Project wind farm is an announced wind farm in Gladstone, Fitzroy Renewable Energy Zone, Queensland, Australia.

Project Details

Table 1: Phase-level project details for Central Queensland Power Project wind farm

Status Commissioning year Nameplate capacity Type Owner
Announced[1] 2038 (planned)[1] 1928 MW[2] Onshore[3] Energy Estate; CleanCo Queensland Ltd; Renewable Energy Systems (RES)[4]

Location

Table 2: Phase-level location details for Central Queensland Power Project wind farm

Location Coordinates (WGS 84)
Gladstone, Fitzroy Renewable Energy Zone, Queensland, Australia[5] -27.4714, 153.0294 (approximate)[5]

The map below shows the approximate location of the wind farm:

Loading map...

Articles and Resources

Additional data

To access additional data, including an interactive map of global wind farms, a downloadable dataset, and summary data, please visit the Global Wind Power Tracker on the Global Energy Monitor website.

References

  1. 1.0 1.1 "Wind Map of Australia 2021" (PDF). ecogeneration. 2021-01. Archived from the original (PDF) on 2024-01-25. Retrieved 2021-06-07. {{cite web}}: Check date values in: |date= (help)
  2. https://web.archive.org/web/20240827151549/https://cleancoqueensland.com.au/our-projects/. Archived from the original on 2024-08-27. {{cite web}}: Missing or empty |title= (help)
  3. https://web.archive.org/web/20240126112630/https://www.centralqueenslandpower.com.au/. Archived from the original on 2024-01-26. {{cite web}}: Missing or empty |title= (help)
  4. https://www.ecogeneration.com.au/wp-content/uploads/2021/01/WindMap-202102.pdf, https://cleancoqueensland.com.au/our-projects/ https://www.ecogeneration.com.au/wp-content/uploads/2021/01/WindMap-202102.pdf, https://www.ecogeneration.com.au/wp-content/uploads/2021/01/WindMap-202102.pdf, https://cleancoqueensland.com.au/our-projects/. {{cite web}}: Check |url= value (help); Missing or empty |title= (help)
  5. 5.0 5.1 https://web.archive.org/web/20240201030322/https://www.centralqueenslandpower.com.au/the-project. Archived from the original on 2024-02-01. {{cite web}}: Missing or empty |title= (help)