Cerrado solar farm

From Global Energy Monitor
This article is part of the
Global Solar Power Tracker, a Global Energy Monitor project.
Report an error

Cerrado solar farm (Parque Solar Cerrado) is a solar photovoltaic (PV) farm in pre-construction in Minas Gerais, Brazil.

Project Details

Table 1: Phase-level project details for Cerrado solar farm

Phase name Status Nameplate capacity Technology Owner Operator
1 Pre-construction[1] 60 MWac[2] PV[2] Ser Sistemas de Energia Renovavel LTDA [100%][2] Ser Sistemas de Energia Renovavel LTDA[2]
2 Pre-construction[1] 50 MW[1] PV[1] Enercom Energias Renováveis LTDA [100%][1]
3 Pre-construction[1] 50 MW[1] PV[1] Enercom Energias Renováveis LTDA [100%][1]

Read more about Solar capacity ratings.

Location

Table 2: Phase-level location details for Cerrado solar farm

Phase Name Location Coordinates (WGS 84)
1 Minas Gerais, Brazil[2] -18.3041, -44.0257 (approximate)[2]
2 Região Integrada de Desenvolvimento do Distrito Federal e Entorno, Região Geográfica Intermediária de Porangatu-Uruaçu, Goiás, Brazil[1] -15.5089, -48.8346 (exact)[1]
3 Região Geográfica Intermediária de Porangatu-Uruaçu, Goiás, Brazil[1] -15.158, -48.8308 (exact)[1]

The map below shows the locations of the solar farm phases:

Loading map...

Articles and Resources

Additional data

To access additional data, including an interactive map of global solar farms, a downloadable dataset, and summary data, please visit the Global Solar Power Tracker on the Global Energy Monitor website.

References

  1. 1.00 1.01 1.02 1.03 1.04 1.05 1.06 1.07 1.08 1.09 1.10 1.11 1.12 https://dadosabertoSAneel.gov.br/. {{cite web}}: Missing or empty |title= (help)
  2. 2.0 2.1 2.2 2.3 2.4 2.5 https://web.archive.org/web/20240201153413/https://www.serrenovaveis.com.br/. Archived from the original on 01 February 2024. {{cite web}}: Check date values in: |archive-date= (help); Missing or empty |title= (help)