Cerrado solar farm
From Global Energy Monitor
This article is part of the Global Solar Power Tracker, a Global Energy Monitor project. |
Cerrado solar farm (Parque Solar Cerrado) is a solar photovoltaic (PV) farm in pre-construction in Minas Gerais, Brazil.
Project Details
Table 1: Phase-level project details for Cerrado solar farm
Phase name | Status | Nameplate capacity | Technology | Owner | Operator |
---|---|---|---|---|---|
1 | Pre-construction[1] | 60 MWac[2] | PV[2] | Ser Sistemas de Energia Renovavel LTDA [100%][2] | Ser Sistemas de Energia Renovavel LTDA[2] |
2 | Pre-construction[1] | 50 MW[1] | PV[1] | Enercom Energias Renováveis LTDA [100%][1] | – |
3 | Pre-construction[1] | 50 MW[1] | PV[1] | Enercom Energias Renováveis LTDA [100%][1] | – |
Read more about Solar capacity ratings.
Location
Table 2: Phase-level location details for Cerrado solar farm
Phase Name | Location | Coordinates (WGS 84) |
---|---|---|
1 | Minas Gerais, Brazil[2] | -18.3041, -44.0257 (approximate)[2] |
2 | Região Integrada de Desenvolvimento do Distrito Federal e Entorno, Região Geográfica Intermediária de Porangatu-Uruaçu, Goiás, Brazil[1] | -15.5089, -48.8346 (exact)[1] |
3 | Região Geográfica Intermediária de Porangatu-Uruaçu, Goiás, Brazil[1] | -15.158, -48.8308 (exact)[1] |
The map below shows the locations of the solar farm phases:
Articles and Resources
Additional data
To access additional data, including an interactive map of global solar farms, a downloadable dataset, and summary data, please visit the Global Solar Power Tracker on the Global Energy Monitor website.
References
- ↑ 1.00 1.01 1.02 1.03 1.04 1.05 1.06 1.07 1.08 1.09 1.10 1.11 1.12 https://dadosabertoSAneel.gov.br/.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 2.0 2.1 2.2 2.3 2.4 2.5 https://web.archive.org/web/20240201153413/https://www.serrenovaveis.com.br/. Archived from the original on 01 February 2024.
{{cite web}}
: Check date values in:|archive-date=
(help); Missing or empty|title=
(help)