Cerro Pabellón geothermal power plant
From Global Energy Monitor
This article is part of the Global Geothermal Power Tracker, a Global Energy Monitor project. |
Cerro Pabellón geothermal power plant (Central geotérmica Cerro Pabellón) is an operating geothermal power plant in Ollagüe, Provincia de El Loa, Antofagasta Region, Chile.
Project Details
Table 1: Unit-level project details for Cerro Pabellón geothermal power plant
Unit name | Status | Commissioning year | Nameplate capacity | Technology | Owner | Operator |
---|---|---|---|---|---|---|
1 | Operating[1] | 2017[1] | 24 MW[2] | Binary cycle[1] | Enel Chile [50%]; Empresa Nacional del Petróleo [50%][3][3] | Geotérmica Del Norte (GDN)[3] |
2 | Operating[1] | 2017[1] | 24 MW[2] | Binary cycle[1] | Enel Chile [50%]; Empresa Nacional del Petróleo [50%][3][3] | Geotérmica Del Norte (GDN)[3] |
3 | Operating[4] | 2021[4] | 33 MW[5] | Binary cycle[3] | Enel Chile [50%]; Empresa Nacional del Petróleo [50%][3][3] | Geotérmica Del Norte (GDN)[3] |
Location
Table 2: Unit-level location details for Cerro Pabellón geothermal power plant
Unit name | Location | Coordinates (WGS 84) |
---|---|---|
1 | Ollagüe, Provincia de El Loa, Antofagasta Region, Chile[6] | -21.8576, -68.1515 (exact)[6] |
2 | Ollagüe, Provincia de El Loa, Antofagasta Region, Chile[6] | -21.8576, -68.1515 (exact)[6] |
3 | Ollagüe, Provincia de El Loa, Antofagasta Region, Chile[6] | -21.8576, -68.1515 (exact)[6] |
The map below shows the exact locations of the geothermal power plant units:
Articles and Resources
Additional data
To access additional data, including an interactive map of global geothermal power plants, a downloadable dataset, and summary data, please visit the Global Geothermal Power Tracker on the Global Energy Monitor website.
References
- ↑ 1.0 1.1 1.2 1.3 1.4 1.5 https://web.archive.org/web/20230128094305/https://www.enel.cl/en/meet-enel/our-power-plants/cerro-pabellon-geothermal-power-plant.html. Archived from the original on 2023-01-28.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 2.0 2.1 https://web.archive.org/web/20221202135619/https://www.enelgreenpower.com/media/news/2019/08/cerro-pabellon-expansion-geothermal-power-plant. Archived from the original on 2022-12-02.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 3.0 3.1 3.2 3.3 3.4 3.5 3.6 3.7 3.8 3.9 https://web.archive.org/web/20221012105458/http://www.enel.cl/en/meet-enel/chiles-energy-is-transforming/cerro-pabellon-geothermal-power-plant.html. Archived from the original on 2022-10-12.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 4.0 4.1 https://web.archive.org/web/20220418165136/https://www.thinkgeoenergy.com/small-yet-growing-contribution-of-geothermal-to-electricity-in-chile/. Archived from the original on 2022-04-18.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://web.archive.org/web/20220526154243/https://www.thinkgeoenergy.com/work-on-expansion-of-cerro-pabellon-geothermal-plant-in-chile-progressing/. Archived from the original on 2022-05-26.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 6.0 6.1 6.2 6.3 6.4 6.5 https://web.archive.org/web/20220418171445/https://www.google.com/maps/place/Cerro+Pabell%C3%B3n+Geothermal+Plant/@-21.8576411,-68.153653,1037m/data=!3m2!1e3!4b1!4m5!3m4!1s0x96ab0004f9bd8801:0x989fab1547ca62d3!8m2!3d-21.8576461!4d-68.1514643?shorturl=1. Archived from the original on 18 April 2022.
{{cite web}}
: Missing or empty|title=
(help)