Changhua Offshore wind farm

From Global Energy Monitor
This article is part of the
Global Wind Power Tracker, a Global Energy Monitor project.
Report an error

Other names: Changhua Offshore Pilot wind farm

Changhua Offshore wind farm (离岸风力发电第一期计画, 離岸風力發電第一期計畫) is an operating wind farm near Changhua County, Taiwan.


Project Details

Table 1: Phase-level project details for Changhua Offshore wind farm

Phase name Status Commissioning year Nameplate capacity Mount type Owner Operator
1 Operating[1] 2021[1] 109[1] Offshore hard mount Jan De Nul Group; Hitachi[2] Jan De Nul Group; Hitachi[3]
2 Pre-construction[1] 2025 (planned)[1] 295[1] Offshore hard mount Taiwan Power Company (TAIPOWER)[1]


Location

Table 2: Phase-level location details for Changhua Offshore wind farm

Phase name Location Coordinates (WGS 84)
1 Changhua County, Taiwan[1] 23.9797, 120.2474 (approximate)[1]
2 Changhua County, Taiwan[1] 24.2871, 120.0506 (approximate)[1]

The map below shows the approximate locations of the wind farm phases:

Loading map...

Background

Articles and Resources

Additional data

To access additional data, including an interactive map of global wind farms, a downloadable dataset, and summary data, please visit the Global Wind Power Tracker on the Global Energy Monitor website.

References

  1. 1.00 1.01 1.02 1.03 1.04 1.05 1.06 1.07 1.08 1.09 1.10 https://www.power-technology.com/projects/taiwan-power-company-tpc-offshore-wind-farm-phase-ii-taiwan/. Archived from the original on August 16, 2022. {{cite web}}: Missing or empty |title= (help)
  2. "JDR thumbs up for Changhua offshore demo". Renewable Energy News. January 29, 2019. Archived from the original on July 29, 2021. Retrieved August 24, 2021.
  3. https://www.jandenul.com/projects/offshore-windfarm-changhua-taiwan. Archived from the original on July 02, 2022. {{cite web}}: Check date values in: |archive-date= (help); Missing or empty |title= (help)