Chapman Hybrid solar farm
From Global Energy Monitor
This article is part of the Global Solar Power Tracker, a Global Energy Monitor project. |
Chapman Hybrid solar farm is a cancelled solar photovoltaic (PV) farm in Geraldton, Western Australia, Australia.
Project Details
Table 1: Phase-level project details for Chapman Hybrid solar farm
Status | Nameplate capacity | Technology | Owner |
---|---|---|---|
Cancelled[1][2] | 50 MW[2] | PV[2] | Investec [100%][2] |
Read more about Solar capacity ratings.
Location
Table 2: Phase-level location details for Chapman Hybrid solar farm
Location | Coordinates (WGS 84) |
---|---|
Geraldton, Western Australia, Australia[2] | -28.7704, 114.6147 (approximate)[2] |
The map below shows the approximate location of the solar farm:
Articles and Resources
Additional data
To access additional data, including an interactive map of global solar farms, a downloadable dataset, and summary data, please visit the Global Solar Power Tracker on the Global Energy Monitor website.
References
- ↑ https://web.archive.org/web/20240206153816/https://www.kalminer.com.au/news/goldfields/investec-pulls-plug-ng-ya-269180. Archived from the original on 06 February 2024.
{{cite web}}
: Check date values in:|archive-date=
(help); Missing or empty|title=
(help) - ↑ 2.0 2.1 2.2 2.3 2.4 2.5 https://web.archive.org/web/20240207074349/https://reneweconomy.com.au/solar-wind-projects-up-in-the-air-as-investec-shuts-division-84989/. Archived from the original on 07 February 2024.
{{cite web}}
: Check date values in:|archive-date=
(help); Missing or empty|title=
(help)