Chapman Hybrid solar farm

From Global Energy Monitor
This article is part of the
Global Solar Power Tracker, a Global Energy Monitor project.
Report an error

Chapman Hybrid solar farm is a cancelled solar photovoltaic (PV) farm in Geraldton, Western Australia, Australia.

Project Details

Table 1: Phase-level project details for Chapman Hybrid solar farm

Status Nameplate capacity Technology Owner
Cancelled[1][2] 50 MW[2] PV[2] Investec [100%][2]

Read more about Solar capacity ratings.

Location

Table 2: Phase-level location details for Chapman Hybrid solar farm

Location Coordinates (WGS 84)
Geraldton, Western Australia, Australia[2] -28.7704, 114.6147 (approximate)[2]

The map below shows the approximate location of the solar farm:

Loading map...

Articles and Resources

Additional data

To access additional data, including an interactive map of global solar farms, a downloadable dataset, and summary data, please visit the Global Solar Power Tracker on the Global Energy Monitor website.

References

  1. https://web.archive.org/web/20240206153816/https://www.kalminer.com.au/news/goldfields/investec-pulls-plug-ng-ya-269180. Archived from the original on 06 February 2024. {{cite web}}: Check date values in: |archive-date= (help); Missing or empty |title= (help)
  2. 2.0 2.1 2.2 2.3 2.4 2.5 https://web.archive.org/web/20240207074349/https://reneweconomy.com.au/solar-wind-projects-up-in-the-air-as-investec-shuts-division-84989/. Archived from the original on 07 February 2024. {{cite web}}: Check date values in: |archive-date= (help); Missing or empty |title= (help)