Chemoga Yeda II hydroelectric plant

From Global Energy Monitor
Part of the
Global Hydropower Tracker,
a Global Energy Monitor project.
Report an error

Chemoga Yeda II hydroelectric plant is an announced hydroelectric power plant in Debre Markos, East Gojjam, Amhara, Ethiopia.

Project Details

Table 1: Project details for Chemoga Yeda II hydroelectric plant

Status Nameplate capacity Turbines Technology type Owner
Announced[1] 118 MW[2] 2[3] Conventional storage[3] Ethiopian Electric Power (EEP)[2]

Location

Table 2: Location details for Chemoga Yeda II hydroelectric plant

Location River Coordinates (WGS 84)
Debre Markos, East Gojjam, Amhara, Amhara, Ethiopia[4] Abay River[3] 10.3202, 37.732 (approximate)[3]

The map below shows the approximate location of the hydroelectric power plant:

Loading map...

Articles and Resources

Additional data

To access additional data, including an interactive map of global nuclear power plants, a downloadable dataset, and summary data, please visit the Global Hydropower Tracker on the Global Energy Monitor website.

References

  1. https://web.archive.org/web/20230826125259/https://www.afdb.org/en/documents/contract-awards-ethiopia-feasibility-100mw-genale-dawa-5-amendment-existing-feasibility-esia/rap-studies-246mw-genale-dawa-6-422mw-halelle-worabesa-stage-12-hpp. Archived from the original on 26 August 2023. {{cite web}}: Missing or empty |title= (help)
  2. 2.0 2.1 (PDF) https://web.archive.org/web/20240125154506/https://ethiopianembassy.org/wp-content/uploads/2021/06/Pipeline-Projects-2020-and-21.pdf. Archived from the original (PDF) on 25 January 2024. {{cite web}}: Missing or empty |title= (help)
  3. 3.0 3.1 3.2 3.3 (PDF) https://web.archive.org/web/20220915164945/https://entrospace.nilebasin.org/bitstream/handle/20.500.12351/101/35_M3_Vol3_ETH_Main_Report.pdf?sequence=1&isAllowed=y. Archived from the original (PDF) on 15 September 2022. {{cite web}}: Missing or empty |title= (help)
  4. (PDF) https://web.archive.org/web/20220914174240/https://entrospace.nilebasin.org/bitstream/handle/20.500.12351/101/35_M3_Vol3_ETH_Main_Report.pdf?sequence=1&isAllowed=y%27. Archived from the original (PDF) on 14 September 2022. {{cite web}}: Missing or empty |title= (help)