Cherikov solar farm
From Global Energy Monitor
This article is part of the Global Solar Power Tracker, a Global Energy Monitor project. |
Other names: Cherykaw
Cherikov solar farm (Чэрыкаў) is an operating solar photovoltaic (PV) farm in Cherikov District, Mogilev Regio, Belarus.
Project Details
Table 1: Phase-level project details for Cherikov solar farm
Status | Commissioning year | Nameplate capacity | Technology | Owner | Operator |
---|---|---|---|---|---|
Operating[1][2] | 2021[1][2] | 109 MW[2] | PV[1] | United Green (ООО «Солар Лэнд»)[3][4] | Solar Land LLC (ООО «Солар Лэнд»)[1] |
Read more about Solar capacity ratings.
Location
Table 2: Phase-level location details for Cherikov solar farm
Location | Coordinates (WGS 84) |
---|---|
Cherikov District, Mogilev Regio, Belarus[3][5] | 53.5559, 31.3778 (exact)[6] |
The map below shows the exact location of the solar farm:
Articles and Resources
Additional data
To access additional data, including an interactive map of global solar farms, a downloadable dataset, and summary data, please visit the Global Solar Power Tracker on the Global Energy Monitor website.
References
- ↑ 1.0 1.1 1.2 1.3 https://www.cherikovnews.by/jenergija-budushhego-krupnejshaja-solnechnaja-jelektrostancija-belarusi-postroena-v-cherikovskom-rajone.html.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 2.0 2.1 2.2 http://195.50.7.239/Cadastre/Map.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 3.0 3.1 https://www.pv-magazine.com/2019/01/03/109-mw-pv-project-in-belarus-commences-construction-located-on-site-irradiated-in-chernobyl-nuclear-disaster/.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://sngsolar.com/project/cherykaw-republic-of-belarus/.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://en.wikipedia.org/wiki/Cherykaw_District.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://goo.gl/maps/GumBNFbbmPeBbaWt7.
{{cite web}}
: Missing or empty|title=
(help)