Chernihiv, Yuzhniy, Lutuginsky Coal Mine

From Global Energy Monitor
This article is part of the
Global Coal Mine Tracker, a project of Global Energy Monitor.
Download full dataset
Report an error
Sub-articles:
Related-articles:

Chernihiv, Yuzhniy, Lutuginsky Coal Mine (Черниговская-Южный-Лутугинский) is a shelved coal mine in Baranovka, Kemerovsky, Kemerovo, Russia.

Location

Table 1: Project-level location details

Mine Name Location Coordinates (WGS 84)
Chernihiv, Yuzhniy, Lutuginsky Coal Mine Baranovka, Kemerovsky, Kemerovo, Russia 55.649117, 86.070671 (exact)

The map below shows the exact location of the coal mine:

Loading map...

Project Details

Table 2: Project status

Status Status Detail Project Type Opening Year Closing Year
Shelved Exploration New

Table 3: Operation details

Note: The asterisk (*) signifies that the value is a GEM estimated figure.
Capacity (Mtpa) Production (Mtpa) Year of Production Mine Type Mining Method Mine Size (km2) Mine Depth (m) Workforce Size
2 Underground 448* *

Table 4: Coal resources and destination

Total Reserves (Mt) Year of Total Reserves Recorded Total Resources (Mt) Coalfield Coal Type Coal Grade Primary Consumer/ Destination
20 Bituminous

Table 5: Ownership and parent company

Owner Parent Company Headquarters
Holding Company SDS Ugol JSC Holding Company Siberian Business Union CJSC Russia

Note: The above section was automatically generated and is based on data from the Global Coal Mine Tracker April 2024 release and the September supplement.

Background

The Chernihiv-Yuzhniy-Lutuginsky coal project (участки шахты Черниговская, Южный, Лутугинский) is a proposed underground mine in Kemerovo Oblast, Russia. The mine project is developed by SDS UGOL, a subsidiary of Siberian Business Union-Coal (SBU) and is set to produce 2.7 million tonnes.

The underground mine project is mentioned in the Russian Government's 'Programme for Coal Industry Development up to 2035' and is set to produce 2.7 mtpa.[1]

There are no news on this underground mine project, but some news on the progress of the surface mine in the same location Glushinsky coal mine, which could indicate that the plans for the underground mine have been abandoned.

In September 2022, the governor of Kuzbass said that new mine projects are on hold due to infrastructure restrictions of coal exports through the Eastern route of Russian Railways, only the projects that are nearing completion are being finished.[2]

  • Operator: SDS UGOL
  • Owner: SDS UGOL
  • Location: north of Novaya Balakhonka, Kemerovsky District, Kemerovo Oblast, Russia
  • GPS Coordinates: 55.649117, 86.070671 (approximate)
  • Status: Shelved
  • Production Capacity: 2.7 mtpa[1]
  • Total Resource: 20.4 million tonnes [1]
  • Mineable Reserves:
  • Coal type:
  • Mine Type: Underground
  • Start Year:
  • Source of Financing:

Articles and Resources

Additional data

To access additional data, including an interactive map of world coal mines, a downloadable dataset, and summary data, please visit the Global Coal Mine Tracker on the Global Energy Monitor website.

References

  1. 1.0 1.1 1.2 "Программа Развития Угольной промышленности до 2035 года". government.ru. June 13, 2020.{{cite web}}: CS1 maint: url-status (link)
  2. "В Кузбассе временно приостановили реализацию крупных инвестпроектов в сфере добычи угля". tass.ru. September 8, 2022.{{cite web}}: CS1 maint: url-status (link)