Chihuido 2 hydroelectric plant

From Global Energy Monitor
Part of the
Global Hydropower Tracker,
a Global Energy Monitor project.
Report an error

Chihuido 2 hydroelectric plant (Central Hidroeléctrica Chihuido 2) is an announced hydroelectric power plant in Neuquen, Argentina.

Project Details

Table 1: Project details for Chihuido 2 hydroelectric plant

Status Commissioning year Nameplate capacity Technology type Owner
Announced[1] 2027 (planned)[2] 234 MW[1] Conventional storage[1] IMPSA (Industrias Metalúrgicas Pescarmona SAIC y F)[1]

Location

Table 2: Location details for Chihuido 2 hydroelectric plant

Location River Coordinates (WGS 84)
Neuquen, Argentina[1] Río Neuquén[3] -38.9535, -68.0598 (approximate)[1]

The map below shows the approximate location of the hydroelectric power plant:

Loading map...

Articles and Resources

Additional data

To access additional data, including an interactive map of global nuclear power plants, a downloadable dataset, and summary data, please visit the Global Hydropower Tracker on the Global Energy Monitor website.

References

  1. 1.0 1.1 1.2 1.3 1.4 1.5 https://web.archive.org/web/20220625000923/https://desarrolloenergetico.com.ar/un-proyecto-que-podria-traerle-dolores-de-cabeza-al-gobierno/. Archived from the original on 25 June 2022. {{cite web}}: Missing or empty |title= (help)
  2. https://www.power-technology.com/data-insights/top-5-hydro-power-plants-in-development-in-argentina/?cf-view. {{cite web}}: Missing or empty |title= (help)
  3. https://web.archive.org/web/20220624125916/https://www.hydroreview.com/hydro-industry-news/contract-awarded-to-build-637-mw-chihuido-hydroelectric-complex-in-argentina/. Archived from the original on 24 June 2022. {{cite web}}: Missing or empty |title= (help)