Chimuara Solar Project
From Global Energy Monitor
This article is part of the Global Solar Power Tracker, a Global Energy Monitor project. |
Chimuara Solar Project is a solar photovoltaic (PV) farm in pre-construction in Zambezia Province, Mozambique.
Project Details
Table 1: Phase-level project details for Chimuara Solar Project
Phase name | Status | Commissioning year | Nameplate capacity | Technology | Owner | Operator |
---|---|---|---|---|---|---|
1 | Pre-construction[1] | 2024 (planned)[2] | 30 MWp/dc[1] | PV[3] | Solarcentury [100%][1] | SunMoz[3] |
future phases | Announced[3] | – | 70 MWac[1] | PV[3] | Solarcentury [100%][1] | SunMoz[3] |
Read more about Solar capacity ratings.
Location
Table 2: Phase-level location details for Chimuara Solar Project
Phase Name | Location | Coordinates (WGS 84) |
---|---|---|
1 | Zambezia Province, Mozambique[3] | -17.7835, 35.4036 (approximate)[3] |
future phases | Zambezia Province, Mozambique[3] | -17.7835, 35.4036 (approximate)[3] |
The map below shows the approximate locations of the solar farm phases:
Articles and Resources
Additional data
To access additional data, including an interactive map of global solar farms, a downloadable dataset, and summary data, please visit the Global Solar Power Tracker on the Global Energy Monitor website.
References
- ↑ 1.0 1.1 1.2 1.3 1.4 https://web.archive.org/web/20240201090821/https://www.pv-magazine.com/2022/07/06/solarcentury-to-build-100-mw-solar-park-in-mozambique/. Archived from the original on 01 February 2024.
{{cite web}}
: Check date values in:|archive-date=
(help); Missing or empty|title=
(help) - ↑ https://web.archive.org/web/20240206155132/https://www.menosfios.com/en/mocambique-chimuara-tera-central-solar-para-gerar-30-mw/. Archived from the original on 06 February 2024.
{{cite web}}
: Check date values in:|archive-date=
(help); Missing or empty|title=
(help) - ↑ 3.0 3.1 3.2 3.3 3.4 3.5 3.6 3.7 3.8 https://web.archive.org/web/20240207084305/https://www.afrik21.africa/en/mozambique-solarcentury-joins-forces-with-resa-and-checunda-for-a-100-mwp-solar-park/. Archived from the original on 07 February 2024.
{{cite web}}
: Check date values in:|archive-date=
(help); Missing or empty|title=
(help)