Chin Chute wind farm
From Global Energy Monitor
This article is part of the Global Wind Power Tracker, a Global Energy Monitor project. |
Chin Chute wind farm is an operating wind farm in Municipal District of Taber, Alberta, Canada.
Project Details
Table 1: Phase-level project details for Chin Chute wind farm
Status | Commissioning year | Nameplate capacity | Type | Owner | Operator |
---|---|---|---|---|---|
Operating[1] | 2006[2] | 30 MW[2] | Onshore[2] | Acciona SA [100%][3] | Acciona[4] |
Location
Table 2: Phase-level location details for Chin Chute wind farm
Location | Coordinates (WGS 84) |
---|---|
Municipal District of Taber, Alberta, Canada[2] | 49.6922, -112.3510 (exact)[2] |
The map below shows the exact location of the wind farm:
Articles and Resources
Additional data
To access additional data, including an interactive map of global wind farms, a downloadable dataset, and summary data, please visit the Global Wind Power Tracker on the Global Energy Monitor website.
References
- ↑ https://www.thewindpower.net/windfarm_en_707_chin-chute.php https://www.acciona.ca/projects/energy/wind-power/chin-chute-wind-farm/, https://www.thewindpower.net/windfarm_en_707_chin-chute.php.
{{cite web}}
: Check|url=
value (help); Missing or empty|title=
(help) - ↑ 2.0 2.1 2.2 2.3 2.4 https://open.canada.ca/data/en/fgpv_vpgf/79fdad93-9025-49ad-ba16-c26d718cc070.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://web.archive.org/web/20090114014758/http://www.acciona-energia.com/default.asp?x=0002020101&lang=En https://www.acciona.ca/projects/energy/wind-power/chin-chute-wind-farm/, https://web.archive.org/web/20090114014758/http://www.acciona-energia.com/default.asp?x=0002020101&lang=En.
{{cite web}}
: Check|url=
value (help); Missing or empty|title=
(help) - ↑ https://web.archive.org/web/20240126120422/https://www.thewindpower.net/windfarm_en_707_chin-chute.php. Archived from the original on 2024-01-26.
{{cite web}}
: Missing or empty|title=
(help)