China Coal Capacity Payment Mechanism

From Global Energy Monitor

Introduction

In November 2023, China’s National Development and Reform Commission (NDRC) published the coal capacity payment mechanism, providing “guaranteed payments” per megawatt of available capacity to eligible coal power plants effective January 1, 2024.[1]

NDRC designed the mechanism to serve two primary objectives: 1) stabilizing revenue expectations for coal plants and 2) enhancing dispatch compliance to improve overall grid reliability given growing levels of variable power generation from renewables. Some analyses have argued the mechanism as currently designed could have the effect of incentivizing the further build-out of new coal plants, as only coal plants are eligible for the payments – including new ones – and not alternatives such as batteries and flexible demand measures.[2]

The annual payment is around 30% or 50% of the standard fixed costs for coal-fired power units, which is 330 yuan per kilowatt per year (yuan/kW/year). Additionally, the annual payment is paid monthly to coal power plants. For provinces with more share of renewable energy (solar, wind, and biomass) — Chongqing, Henan, Hunan, Guangxi, Qinghai, Sichuan and Yunnan, the payment is higher at 165 yuan/kW.[1] The payment will increase to at least 50% of the standard fixed costs for coal-fired units starting from 2026, and no less than 70% for provinces with rapid coal power transition.[3]

The capacity payment mechanism applies to compliantly-operating public coal-fired power units. This does not apply to captive power plants, coal-fired power units that do not conform to national planning, and coal-fired power units that do not meet national requirements for energy consumption, environmental protection, and flexible regulation capacity.

GCPT has captured the publicly available information for 11 provinces which have unit-level lists in 2024, and we have kept updating the lists for each province. For example, Guangxi Autonomous Region has added 4 units after they first published the recipient list.

Capacity Payment Details by Province

All tables are limited to Global Coal Plant Tracker (GCPT) countries. The GCPT provides information on coal-fired power units from around the world generating 30 megawatts and above. The GCPT catalogues every operating coal-fired generating unit, every new unit proposed since 2010, and every unit retired since 2000. To share feedback or report an error found on this wiki page, please visit the GCPT error reporting form.

Provinces with capacity payment lists

Province Capacity Payment (Yuan/kW·Year) Most Recent Updated Date Sources
Anhui 100 2023/12/28 [3]
Guangxi 165 2024/09/11 [4][5][6]
Hebei 100 2024/1/15 [7]
Henan 165 2023/12/27 [8]
Jilin 100 2024/01/04 [9]
Liaoning 100 2024/03/13 [10]
Qinghai 165 2025/02/05 [11]
Shandong 100 2024/11/08 [12][13]
Shanghai 100 2024/03/18 [14]
Tianjin 100 2024/01/04 [15]
Yunnan 165 2024/02/02 [16]
Zhejiang 100 2024/01/03 [17]

Provinces without publicly available capacity payment lists

Province Capacity Payment (Yuan/kW·Year) Last Research Date Sources
Beijing 100 2025/02/05 [3]
Chongqing 165 2025/02/05 [18]
Fujian 100 2025/02/05 [19]
Gansu 100 2025/02/05 [20]
Guangdong 100 2025/02/05 [21]
Guizhou 100 2025/02/05 [22]
Hainan 100 2025/02/05 [23]
Heilongjiang 100 2025/02/05 [3]
Hubei 100 2025/02/05 [3]
Hunan 165 2025/02/05 [24]
Inner Mongolia 100 2025/02/05 [3]
Jiangsu 100 2025/02/05 [25]
Jiangxi 100 2025/02/05 [3]
Ningxia 100 2025/02/05 [26]
Shaanxi 100 2025/02/05 [27]
Shanxi 100 2025/02/05 [28]
Sichuan 165 2025/02/05 [29]
Xinjiang 100 2025/02/05 [30]

Recommended resources

  • [1] – China Power Enterprise Management New Media
  • [2] – Regulatory Assistance Project
  • [3] – Dialogue Earth

References

  1. 1.0 1.1 "关于建立煤电容量电价机制的通知(发改价格〔2023〕1501号)", National Development and Reform Commission, November 10 2023
  2. Max Dupuy, Chi Gao, "Changing how coal power plants get paid: What’s next for policy in China," Regulatory Assistance Project, December 18, 2024
  3. 3.0 3.1 3.2 3.3 3.4 3.5 3.6 "安徽省发展改革委安徽省能源局关于贯彻落实煤电容量电价机制有关事项的通知", Chizhou Development and Reform Commission, December 28 2023
  4. "33台!广西适用煤电容量电价机制机组清单公示", Guangxi Development and Reform Committee, March 8 2024
  5. "广西公示新投运煤电机组适用煤电容量电价机制认定情况", Guangxi Autonomous Region Energy Administration, May 20 2024
  6. "新增2台机组!广西新投运煤电机组适用煤电容量电价机制认定情况公示", Guangxi Development and Reform Commission, September 11 2024
  7. "承德市发展和改革委员会文件", Chengde Development and Reform Commission, January 15 2024
  8. "河南明确煤电容量电价机制有关事项:2024-2025年月度标准为13.75元/千瓦", Henan Development and Reform Commission, December 27 2023
  9. "吉林落实煤电容量电价机制有关事项通知", Chizhou Development and Reform Commission, January 4 2024
  10. "辽宁省印发关于建立煤电容量电价机制的通知", Liaoning Development and Reform Commission, March 13 2024
  11. "青海省拟适用煤电容量电价机制机组清单公示", Chizhou Qinghai Province Energy Administration, December 2 2024
  12. "附件:适用煤电容量电价机制机组清单", Energy Administration of Shandong Province, January 14 2024
  13. "关于印发适用煤电容量电价机制机组清单的补充通知", Energy Administration of Shandong Province, November 8 2024
  14. "2024年2月上海电网煤电容量电费相关结果公示", Shanghai Power Exchange Center, March 18 2024
  15. "天津落实煤电容量电价机制有关事项通知", Tianjin Development and Reform Commission, January 4 2024
  16. "云南省公布煤电容量电价适用机组清单", Yunnan Energy Administration, Feburary 2 2024
  17. "安浙江明确煤电容量电价机制执行有关事项", Zhejiang Development and Reform Commission, January 3 2024
  18. "重庆市发展和改革委员会关于贯彻落实煤电容量电价机制有关事项的通知", Chongqing Development and Reform Commission, December 25 2023
  19. "福建电力交易中心关于煤电容量电价政策与2024年度零售市场交易衔接的提示", Fujian Power Exchange Center, January 15 2024
  20. "甘肃省发展和改革委员会国家能源局甘肃监管办公室关于实施煤电容量电价机制有关事项的通知", Gansu Economy Institute, January 8 2024
  21. "广东省发展改革委 广东省能源局 国家能源局南方监管局关于我省煤电气电容量电价机制有关事项的通知", Guangdong Provincial Development and Reform Commission, December 28 2023
  22. "贵州建立煤电容量电价机制:煤电容量电费纳入系统运行费用", Guizhou Development and Reform Commission, January 2 2024
  23. "安海南:纳入系统运行费用“煤电容量电费”科目单独列示", Hainan Development and Reform Commission, December 28 2023
  24. "湖南:落实煤电容量电价政策 建立天然气发电气电联动和容量电价机制", People's Government of Hunan Province, May 13 2024
  25. "省发展改革委关于做好煤电容量电价机制改革有关工作的通知", Jiangsu Development and Reform Commission, December 26 2023
  26. "自治区发展改革委关于落实建立煤电容量电价机制有关事项的通知", Ningxia Development and Reform Commission, December 28 2023
  27. "宝鸡市发展和改革委员会文件", Baoji Development and Reform Commission, December 25 2023
  28. "山西省发展和改革委员会 山西省能源局国家能源局 山西监管办公室 关于我省煤电容量电价机制有关事项的通知", Zezhou Development and Reform Commission, January 8 2024
  29. "四川省:建立煤电容量电价机制", Sichuan Development and Reform Commission, January 19 2024
  30. "国家发展改革委 国家能源局关于建立煤电容量电价机制的通知", Xinjiang Uygur Autonomous Region Development and Reform Commission, November 10 2023

About the Global Coal Plant Tracker

To access additional data, including an interactive map of coal-fired power stations, a downloadable dataset, and summary data, please visit the Global Coal Plant Tracker on the Global Energy Monitor website.