Chinook Coal Project

From Global Energy Monitor
This article is part of the
Global Coal Mine Tracker, a project of Global Energy Monitor.
Download full dataset
Report an error
Sub-articles:
Related-articles:

Chinook Coal Project is a shelved coal mine in Crowsnest Pass, Alberta, Canada.

Location

Table 1: Project-level location details

Mine Name Location Coordinates (WGS 84)
Chinook Coal Project Crowsnest Pass, Alberta, Canada[1] 49.56884, -114.690198 (approximate)

The map below shows the approximate location of the coal mine:

Loading map...

Project Details

Table 2: Project status

Status Status Detail Project Type Opening Year Closing Year
Shelved[2] Exploration[3] New 2027 (planned)[3]

Table 3: Operation details

Note: The asterisk (*) signifies that the value is a GEM estimated figure.
Capacity (Mtpa) Production (Mtpa) Year of Production Mine Type Mining Method Mine Size (km2) Mine Depth (m) Workforce Size
Surface Open Pit 100[3] 300[1] *

Table 4: Coal resources and destination

Total Reserves (Mt) Year of Total Reserves Recorded Total Resources (Mt) Coalfield Coal Type Coal Grade Primary Consumer/ Destination
172[4] Bituminous Met

Table 5: Ownership and parent company

Owner Parent Company Headquarters
Evolve Power Ltd[3][2] Evolve Power Ltd [100%] Australia

Note: The above section was automatically generated and is based on data from the Global Coal Mine Tracker April 2024 release and the September supplement.

Background

The Chinook Coal Project is a proposed mine in Alberta, Canada.[5]

As of June 2023, project owner, Evolve Power, reports that the project has been shelved, due to the government of Alberta's moratorium on coal exploration and development.[6] The project is owned by Evolve Power (formerly known as Montem Resources Limited) in the Crowsnest Pass of southwest Alberta.

In 2021, Montem completed a positive Scoping Study to guide the strategic development of the Chinook Project.

As of 2023, Evolve Power is awaiting the release of the Government’s updated policies and plans before conducting further exploration and development activities, including the Chinook Project.[6] As stated in Evolve Power's 2023 half year report:
Due to a government of Alberta imposed moratorium on coal exploration and development that covers Evolve Power’s other coal assets in the Crowsnest Pass (Evolve Power Properties), Evolve Power has moved away from its original aim to develop its steelmaking coal assets in the Crowsnest Pass. The Consolidated Entity is in the process of exiting its coal business and has ceased all coal development activities. As the Consolidated Entity exits the coal business, certain assets and activities will remain until the exit is complete.[6]

  • Owner: Evolve Power
  • Parent company: Evolve Power
  • Location: Crowsnest Pass, Alberta, Canada
  • GPS coordinates: 49.56884, -114.690198 (approximate)
  • Mine status: Shelved
  • Start year:
  • Resources: 172 million tonnes
  • Coal type: Bituminous, Metallurgical
  • Mine size: 10,000 hectares
  • Mine type: Surface
  • Capacity:
  • Number of employees:

Articles and Resources

Additional data

To access additional data, including an interactive map of world coal mines, a downloadable dataset, and summary data, please visit the Global Coal Mine Tracker on the Global Energy Monitor website.

References

  1. 1.0 1.1 (PDF) https://montem-resources.com/wp-content/uploads/2020/07/2020-04-09-JORC_Chinook-Project_FINAL_Signed.pdf. {{cite web}}: Missing or empty |title= (help)
  2. 2.0 2.1 https://web.archive.org/web/20240718162956/https://evolvepower.ca/reports/june-2023-half-year-report/. Archived from the original on 18 July 2024. {{cite web}}: Missing or empty |title= (help)
  3. 3.0 3.1 3.2 3.3 https://albertabeyondcoal.ca/resources/coal-projects/. {{cite web}}: Missing or empty |title= (help)
  4. https://web.archive.org/web/20221202103929/https://montem-resources.com/projects/chinook-project/. {{cite web}}: Missing or empty |title= (help)
  5. "Chinook Project", Montem Resources website, Archived from the original on 2 December 2022, Accessed November 2023.
  6. 6.0 6.1 6.2 June 2023 Half Year Report, Evolve Power website, Accessed November 2023.