Chiren-Butan Gas Pipeline

From Global Energy Monitor
Part of the
Global Gas Infrastructure Tracker,
a Global Energy Monitor project.
Download full dataset
Report an error
Related categories:

Chiren-Butan Gas Pipeline is an a proposed gas pipeline in Bulgaria

Location

The pipeline will run from Chiren, Bulgaria to Butan, Bulgaria.[1]


Loading map...

Project details

  • Operator: Bulgartransgaz EAD
  • Owner: Bulgartransgaz EAD
  • Parent company: Bulgartransgaz EAD[2]
  • Capacity:
  • Length: 41km
  • Diameter: 700mm
  • Status: Construction[3]
  • Start year: 2024
  • Cost:
  • Financing: PCI 6
  • Associated infrastructure: Chiren Underground Storage

Background

This pipeline will allow for the expansion of the Chiren UGS facility, as well as the potential eventual conversion of the storage to Hydrogen.

Articles and resources

References

  1. "2022-2031 TEN-YEAR NETWORK DEVELOPMENT PLAN OF BULGARTRANSGAZ EAD" (PDF). {{cite web}}: line feed character in |title= at position 19 (help)CS1 maint: url-status (link)
  2. https://www.globaldata.com/store/report/bulgartransgaz-ead-chiren-butan-gas-pipeline-vratsa-profile-snapshot/. {{cite web}}: Missing or empty |title= (help)CS1 maint: url-status (link)
  3. "Bulgartransgaz signs 113 mln euro contract for Chiren gas storage expansion". SeeNews. Retrieved 2023-10-03.